Skip to main content
Log in

Wenn die Kosten von Großprojekten explodieren

  • Unternehmenssteuerung
  • Vergabepraxis
  • Published:
Controlling & Management Review Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Literatur

  • Decker, H. (2015): Großprojekte werden zu optimistisch geplant, in: Frankfurter Allgemeine Zeitung, S. 24.

    Google Scholar 

  • Flyvbjerg, B. (2014): What You Should Know About Megaprojects and Why: An Overview, in: Project Management Journal, 2 (45), S. 6–19.

    Article  Google Scholar 

  • Flyvbjerg, B./Sunstein, C. (2015): The Principle of the Malevolent Hiding Hand; or the Planning Fallacy Writ Large, Draft 4.4, forthcoming in: Social Research.

    Google Scholar 

  • Hertie School of Governance (2015): Großprojekte in Deutschland — Zwischen Ambition und Realität, Mai 2015.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Carsten Kruppe.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Kruppe, C. Wenn die Kosten von Großprojekten explodieren. Control Manag Rev 60, 50–54 (2016). https://doi.org/10.1007/s12176-016-0072-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12176-016-0072-1

Navigation