Investigations on the Failure of Economizer Tubes in a High-Pressure Boiler

  • Case History—Peer-Reviewed
  • Published:
Journal of Failure Analysis and Prevention Aims and scope Submit manuscript

Abstract

This article describes the results of an investigation concerning the failure of economizer tubes of a high-pressure boiler in a dual-purpose power/water cogeneration plant. The failure was observed in the form of rupturing of one tube and a macrohole or pinhole in another tube. The boiler had an operating period of 116,123 h since its inception. For approximately the first 100,000 h, the fuel for the boiler was crude oil, which was replaced by Bunker C oil. The boiler tube is fabricated from carbon steel SA 210A1. The location of the failure was determined by on-site visual inspection of the boiler. Detailed macro- and microexaminations of inner and outer scales on the tube were begun to determine the cause of the rupture. The composition of the fire- and waterside scale and ash deposited on the outer surface of the tubes was analyzed by energy-dispersive x-ray (EDX) technique. The reduction percentage of wall thickness of the tube facing inside and outside the furnace was calculated. The cause of the failure of the economizer tube appears to be H2SO4 dew-point corrosion. The relatively low temperature of feedwater lowered the tube metal temperature and promoted the condensation of H2SO4. The external deposits on the tubes, as a result of bunker oil firing, further helped to lower the tube metal temperature, thus promoting H2SO4 condensation over the deposit and subsequent corrosion of the tube wall. Recommendations are given to prevent/minimize such failures.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  1. Mobin, M., Malik, A.U., Andijani, I.N., Al-Muaili, F., Al-Hajri, M.: Premature water-side corrosion of furnace wall tubes in a high pressure boiler. Mater. Perform. 62(9), 44–49 (2006).

    Google Scholar 

  2. Gabrielli, F.: An overview of water related tube failures in industrial boilers. Mater. Perform. 27(6), 51 (1988).

    CAS  Google Scholar 

  3. Malik, A.U., Asrar, N., Al-Ghamdi, M.F., Hodhan, A.H.: Investigation of boiler tubes failure in SWCC Jeddah plant. Arab. J. Sci. Eng. 20(4B), 809 (1995).

    CAS  Google Scholar 

  4. Jonas, O.: Boiler Tube Sampling and Inspection Procedures, Recommended Practices, Water Chemistry Control. Jonas, Inc., Wilmington, DE (1992).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. Mobin.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mobin, M., Malik, A.U. & Al-Hajri, M. Investigations on the Failure of Economizer Tubes in a High-Pressure Boiler. J Fail. Anal. and Preven. 8, 69–74 (2008). https://doi.org/10.1007/s11668-007-9094-5

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11668-007-9094-5

Keywords

Navigation