Abstract
Time-cost models have been developed in various contexts to assist in forecasting the duration of different types of projects. The present research explores the influence of the construction technology on the time-cost relationship. For that purpose, the data from 21 sewerage projects using trenchless technology and from 49 sewerage projects using the traditional open-cut method was analyzed. The 70 sewerage projects analyzed were completed in Chicago, U.S., between 1994 and 2002. The influence of the construction technology in the time-cost relationship was found to be statistically significant and time-relationships were determined for sewerage projects using trenchless technology and the traditional open-cut method. Furthermore, along with the Bromilow type models an alternative approach was tested using the time normalized by the project cost as dependent variable, allowing additional insight into the time performance of the open-cut and lining technology used (cured in place).
Similar content being viewed by others
References
Alfred LE (1988) Construction productivity – on site measurement and management. McGraw-Hill, Sydney
Bromilow FJ (1969) Contract time performance—expectation and the reality. Build Forum 1(3):70–80
Chan APC (2001) Time-cost relationship of public sector projects in Malaysia. Int J Proj Manag 19:223–229
Chan APC, Chan DWM (2004) Developing a benchmark model for project construction time performance in Hong Kong. Build Environ 39(3):339–349
Chan DWM, Kumaraswamy MM (1999) Forecasting construction durations for public housing projects: a Hong Kong perspective. Build Environ 34(5):633–646
Chen WT, Huang Y-H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Constr Manag Econ 24(12):1231–1239
Chitkara K (2001) Construction project management techniques and practice. Tata McGraw-Hill, New Deli
Choudhury I, Rajan SS (2003) Time-cost relationship for residential construction in Texas. Constr Inf Digit Libr w78-2003-73
CIDA (1993) Project performance update – a report on the cost and time performance of Australian building projects completed 1988–1993. Construction Industry Development Agency, Australia
EPA (2006) Emerging technologies for conveyance systems - new installations and rehabilitation methods. Handbook, EPA 832-R-06-004, United States Environmental Protection Agency (EPA), Office of Wastewater Management, Washington, D.C., USA
Hoffman GJ, Thal AE Jr, Webb TS, Weir JD (2007) Estimating performance time for construction projects. J Manag Eng 23(4):193–199
Kaka A, Price ADF (1991) Relationship between value and duration of construction projects. Constr Manag Econ 9(4):383–400
Kenley R (2001) The predictive ability of Bromilow's time-cost model: comment. Constr Manag Econ 19(8):759–764
Khosrowshahi F, Kaka AP (1996) Estimation of project total cost and duration for housing projects in the U.K. Build Environ 31(4):373–383
Kumaraswamy MM, Chan DWM (1995) Determinants of construction duration. Constr Manag Econ 13:209–217
Love PED, Tse RYC, Edwards DJ (2005) Time–cost relationships in Australian building construction projects. J Constr Eng Manag 131(2):187–194
Marchionni V, Cabral M, Amado C, Covas D (2016) Estimating water supply infrastructure cost using regression techniques. J Water Res PL-ASCE 142(4). https://doi.org/10.1061/(ASCE)WR.1943-5452.0000627
Martin J, Burrows T, Pegg I (2006) Predicting construction duration of building projects. Shaping the Change, XXIII FIG Congress, Munich, Germany, October 8-13
NEDO (1988) Faster building for commerce. National Economic Development Office (NEDO). Millbank, UK
Skitmore RM, Ng ST (2003) Forecast models for actual construction time and cost. Build Environ 8(8):1075–1083
Sousa V (2012) Risk management in construction: application to urban drainage projects. Ph.D. Thesis, IST – Universidade de Lisboa, Lisbon, Portugal. (in Portuguese)
Sousa V, Almeida N, Dias L, Branco F (2014a) Risk-informed time-cost relationship models for sanitation projects. J Constr Eng Manag 140(5):06014002
Sousa V, Almeida N, Dias L (2014b) Role of statistics and engineering judgment in developing optimized time-cost relationship models. J Constr Eng Manag 140(8):04014034
Walker DHT (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia
Yousef G, Baccarini D (2001) Developing a cost–time model for estimating construction durations of sewerage projects in Perth, Western Australia. J Constr Res 2(2):213–220
Acknowledgments
VS acknowledges the financial support from IST – Universidade de Lisboa (Start Up – 4835) and the Portuguese National Science Foundation (grant SFRH/BSAB/113784/2015) for the sabbatical leave at École Polytechnique Fédérale de Lausanne where part of this work was carried out.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Sousa, V., Meireles, I. The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects. Water Resour Manage 32, 2753–2766 (2018). https://doi.org/10.1007/s11269-018-1956-y
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-018-1956-y