1 Correction to: Optimization and Engineering https://doi.org/10.1007/s11081-019-09444-3

In the original publication of the article, in Table 4 and Table 5 lower case ‘k’ which is the correct convention of the units was published as upper case ‘K’.

Table 4 Results of the implementation of the TSS formulation over the typical stochastic assumptions, i.e.: perfect information (PI), recourse problem (RP), expectation of the expected value problem (EEVP)
Table 5 Results of CVaR, VaR and hydrogen plant H4 at confidence levels 95% and 99%

The corrected tables are provided below.