Skip to main content

Advertisement

Log in

Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1

  • Published:
Power Technology and Engineering Aims and scope

Abrief information about Chiryurt hydroelectric station located in the Republic of Dagestan is presented. The complex value of the derivation channel of Chiryurt Hydro Power Plant (HPP)-1 for the Republic and the problems of its operation at the present time are described in detail. A comparative assessment of various options for canal reconstruction is given, considering the need for the operation of the waterworks during reconstruction and the minimization of social tension risks in the region. The conclusion is made about the optimal variant of reconstruction that provides a reliable and safe operation of the hydroelectric station.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to K. V. Purgin.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 12, December 2020, pp. 6 – 8.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Purgin, K.V., Sretenskiy, A.V. & Antropkin, V.V. Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1. Power Technol Eng 54, 41–43 (2020). https://doi.org/10.1007/s10749-020-01164-4

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-020-01164-4

Keywords

Navigation