Interaction of the arch dam at the Chirkey HPP with the bed and rock masses of the banks is analyzed on the basis of data derived from an innovative seismologic monitoring system, and the results are compared with multiyear official scientific observations relative to assessment of the “dam – Bed” system.
Similar content being viewed by others
References
A. N. Marchuk and N. A. Marchuk, Dams and Geodynamics [in Russian], Izd. IFZ RAN, Moscow (2006), p. 156.
A. N. Marchuk and N. A. Marchuk, “Prediction of the earthquake of 11 October 2008 in Northern Kavkaz with use of the measurement systems employed at the Chirkey and Miatla HPP,” Gidrotekh. Stroit., No. 3, 47 – 50 (2009).
T. G. Gamzatov, M. A. Saidov, A. M. Baksaraev, N. K. Kapustyan, and G. I. Antonskaya, “Innovative seismological monitoring system of HPP dams in Dagestan” Stroit. Mater. Oborud. Tekhnol. XXI Veka, No. 3, 50 – 53 (2014).
L. N. Rasskazov, V. G. Orekhov, N. A. Anskin et al., Water-Development Works. Part 2 [in Russian], Moscow (2008), p. 527.
Author information
Authors and Affiliations
Corresponding author
Additional information
Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 10, October 2014, pp. 23 – 26.
Rights and permissions
About this article
Cite this article
Marchuk, A.N., Marchuk, N.A. Use of Seismograms for Analysis of the Condition of the “Dam – Bed” System at the Chirkey HPP. Power Technol Eng 48, 439–442 (2015). https://doi.org/10.1007/s10749-015-0550-1
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10749-015-0550-1