Automatic separation of TPP auxiliaries in the event of an emergency frequency or voltage transient in the grid

  • V. S. Burtakov
  • L. N. Kas’yanov
  • B. N. Glusker
  • V. A. Kuz’michev
Article
  • 40 Downloads

The existing methods of isolating the TPP auxiliaries in the event of an emergency frequency and/or voltage transient in the grid are discussed. Requirements to the actions of the underfrequency islanding system in such situations are formulated. Based on the studies conducted by the JSC “Firm ORGRES” at a number of power plants, engineering solutions for the automatic separation of TPP auxiliaries are proposed.

Keywords

auxiliaries frequency voltage power grid power plant emergency control system algorithm 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    F. L. Kogan, “On the causes of the well-known Moscow power blackout,” Élektrichestvo, No. 5, 69–72 (2008).Google Scholar
  2. 2.
    STO 59012820.29.240.008–2008. Automatic Emergency Control of Power System Operating Conditions. Automatic Emergency Control Systems. Workflow and Implementation Requirements. Standards and Specifications [in Russian], Moscow (2008).Google Scholar
  3. 3.
    Automatic Underfrequency Limitation in Case of Emergency Active-Power Shortage (Underfrequency Load Shedding) in the UPS of Russia. Technical Regulations [in Russian], Approved by JSC “SO EÉS”, Order No. 1041, April 1 (2008).Google Scholar
  4. 4.
    G. G. Ol’khovskii, “Controllability of CCPPs,” Énergokhoz. Za Rubezh., No. 1(254), 19 – 25 (2011).Google Scholar

Copyright information

© Springer Science+Business Media New York 2013

Authors and Affiliations

  • V. S. Burtakov
    • 1
  • L. N. Kas’yanov
    • 1
  • B. N. Glusker
    • 1
  • V. A. Kuz’michev
    • 1
  1. 1.JSC “Firm ORGRES”MoscowRussia

Personalised recommendations