Skip to main content
Log in

Formation of the stress-strain state of the dam at the Sayano-Shushenskaya HPP during 2010 filling of reservoir

  • Published:
Power Technology and Engineering Aims and scope

Results of intentional action on the temperature field of the dam, which had been supercooled during the winter of 2009/10, to improve its stress-strain state by regulation of the reservoir-filling regime, are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. A. Khrapkov, “Condition of the water-developmnent works at the Sayano-Shushenskaya HPP during operation in the winter of 2009/10,” Gidrotekh. Stroit., No. 7, 14 – 21 (2010).

  2. É. G. Gaziev, “Analysis of the modern stress-strain state of the arch-gravity dam at the Sayano-Shushenskaya HPP,” Gidrotekh. Stroit., No. 9, 48 – 57 (2010).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 4, April 2011, pp. 2 – 6.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Permyakova, L.S., Epifanov, A.P. Formation of the stress-strain state of the dam at the Sayano-Shushenskaya HPP during 2010 filling of reservoir. Power Technol Eng 45, 188–192 (2011). https://doi.org/10.1007/s10749-011-0246-0

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-011-0246-0

Keywords

Navigation