The condition of the thermomechanical equipment of 800-MW power generating units of the Surgut State Regional Power Plant (GRES-2) after twenty years of operation is analyzed. Attention is concentrated at “problem” units and components of the equipment that have exhausted the scheduled service life or had been damaged considerably during operation. Abrief report of the results of a study of the metal of the power equipment is presented and measures are suggested for raising the reliability and efficiency of generating units of the Surgut GRES-2.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
__________
Translated from Elektricheskie Stantsii, No. 3, March 2005, pp. 11 – 15.
Rights and permissions
About this article
Cite this article
Rezinskikh, V.F., Grin’, E.A. & Bukin, Y.A. Operational Reliability and Prospects of Continuation of Service of the Thermomechanical Equipment of the Surgut GRES-2. Power Technol Eng 39, 156–159 (2005). https://doi.org/10.1007/s10749-005-0302-8
Issue Date:
DOI: https://doi.org/10.1007/s10749-005-0302-8