Skip to main content
Fig. 2 | Climatic Change

Fig. 2

From: Uncertainties in projected runoff over the conterminous United States

Fig. 2

Relative contribution (on 100%) to uncertainty in Amax: on the left a the full ensemble (oE); on the right b the credibilty ensemble (cE). The layout: in column, from left to right the uncertainty sources: GCMs, GIMs, RCPs, and internal variability; in row, from top to bottom the time slices: 2010, 2030, 2050, and 2070. These results refer to the absolute changes

Back to article page