Skip to main content
Log in

Integrated project management system

  • Published:
Cybernetics and Systems Analysis Aims and scope

The development of an integrated project management system for the building industry is described. Some principles of electronic document management and authority ranking for getting access to documents are considered. A methodology is presented for the organization of team work planning using Web access mode, project stage monitoring, and report generation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. I. Karapuzov and V. G. Sokha, Modern Approaches to the Design in the Construction Activity [in Russian], Vyshcha Osvita, Kiev (2006).

    Google Scholar 

  2. Henkel Bautechnik (Ukraine), Corporative Standards D-TsK-2006.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to V. V. Kryzhanovskyy.

Additional information

Translated from Kibernetika i Sistemnyi Analiz, No. 6, pp. 131–136, November–December 2009.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kryzhanovskyy, V.V., Popov, S.N. Integrated project management system. Cybern Syst Anal 45, 966–970 (2009). https://doi.org/10.1007/s10559-009-9170-9

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10559-009-9170-9

Keywords

Navigation