Advertisement

Chemical and Petroleum Engineering

, Volume 41, Issue 11–12, pp 579–583 | Cite as

A new series of unitized mobile high-pressure oil and gas pumping units

  • T. M. Dautov
  • R. E. Gazarov
Oil and Gas Equipment
  • 29 Downloads

Abstract

Technical characteristics of several versions of a unitized series of pumping units differing essentially in hydraulic blocks, materials of domestic elements of the delivery lines, and high-pressure safety devices are given. Designs of blocks of the pumping unit are described.

Keywords

Mineral Resource Technical Characteristic Safety Device Delivery Line Unitize Series 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    R. E. Gazarov, “A new equipment complex KO GRP-105/50K for hydraulic formation fracturing,” Konvers. Mashinostr., No. 6, 25–32 (1999).Google Scholar
  2. 2.
    É. S. Ibragimov and R. E. Gazarov, “Influence of characteristics of diesel engine on performance of high-pressure pumping unit,” Azerbaidzh. Neft. Khoz., No. 11, 52–56 (1983).Google Scholar
  3. 3.
    É. S. Ibragimov, R. E. Gazarov, et al., “General-service oil field pumping unit UNB2-630×500,” Khim. Neft. Mashinostr., No. 8, 5–8 (1984).Google Scholar
  4. 4.
    É. S. Ibragimov, R. E. Gazarov, et al., “Pumping unit for acid treatment of oil and gas wells,” Khim. Neft. Mashinostr., No. 9, 14–15 (1985).Google Scholar
  5. 5.
    R. E. Gazarov, R. I. Gadzhiev, et al., “Safety standards for high-pressure oil field equipment,” Bezopas. Truda v Promysh., No. 1, 51–53 (1985).Google Scholar
  6. 6.
    R. E. Gazarov and M. Yu. Zaslavskii, “Procedure for calculation of oil and gas field differential safety valves with truncated stems,” Khim. Neftegaz. Mashinostr., No. 10, 15–17 (2003).Google Scholar
  7. 7.
    R. E. Gazarov and Yu. V. Zaslavskii, “Procedure for calculation of oil and gas field high-pressure valves with cylindric plug,” Khim. Neftegaz. Mashinostr., No. 11, 15–17 (2003).Google Scholar
  8. 8.
    T. M. Dautov and R. E. Gazarov, “New-generation oil and gas field cutoff-safety valves,” Khim. Neftegaz. Mashinostr., No. 7, 38–42 (2002).Google Scholar
  9. 9.
    T. M. Dautov and R. E. Gazarov, “New-generation oil and gas field plunger pumps made by OAO Izhneftemash,” Khim. Neftegaz. Mashinostr., No. 7, 10–14 (2003).Google Scholar
  10. 10.
    T. M. Dautov and R. E. Gazarov, “New-generation drilling and general-service plunger and high-pressure pumps,” Khim. Neftegaz. Mashinostr., No. 9, 11–14 (2005).Google Scholar

Copyright information

© Springer Science+Business Media, Inc. 2005

Authors and Affiliations

  • T. M. Dautov
    • 1
  • R. E. Gazarov
    • 2
  1. 1.Izhneftemash OAOIzhevsk
  2. 2.VNIIneftemash OAOMoscow

Personalised recommendations