Rights and permissions
About this article
Cite this article
Washout Periods May be Required Between GTN Patch Applications. Inpharma Wkly. 509, 2 (1985). https://doi.org/10.1007/BF03313196
Published:
Issue Date:
DOI: https://doi.org/10.1007/BF03313196