Skip to main content
Log in

Allowance of lateral breakthrough error for super long tunnels from 20km to 50km

  • Published:
Geo-spatial Information Science

Abstract

Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Chen Y Q, Li Q Y (1995) Engineering geodesy. Beijing: Publishing House of Surveying and Mapping.

    Google Scholar 

  2. Zhang Z L (2002) Engineering geodesy. Wuhan: Publishing House of Wuhan University.

    Google Scholar 

  3. Zhang X D, Zhang Z L (1998) Surveying of tunnel engineering. Beijing: Publishing House of Surveying and Mapping.

    Google Scholar 

  4. Zhang Z L, Guo J M, Huang Q Y, et al. (1996) Research into an automatic system of data gathering and processing for terrestrial control surveying. Pelzer zum 60. Geburtstag, Hannover.

Download references

Author information

Authors and Affiliations

Authors

About this article

Cite this article

Zhenglu, Z., Songlin, Z. Allowance of lateral breakthrough error for super long tunnels from 20km to 50km. Geo-spat. Inf. Sci. 7, 198–203 (2004). https://doi.org/10.1007/BF02826291

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02826291

Key Words

CLC Number

Navigation