Optimal “calendar” network of mine workings

This is a preview of subscription content, access via your institution.

Authors

Additional information

Institute of Mining, Siberian Branch, Academy of Sciences of the USSR, Novosibirsk, Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 93–95, September–October, 1982.

Rights and permissions

Reprints and Permissions

About this article

Cite this article

Strekachinskii, G.A. Optimal “calendar” network of mine workings. Soviet Mining Science 18, 437–439 (1982). https://doi.org/10.1007/BF02528453

Download citation

Keywords

  • Timber
  • Additional Node
  • Optimal Transportation
  • Segment Number
  • Mining Field