Skip to main content
Log in

A method of compiling a schedule of intraquarry truck transport

  • Open-cut Mining
  • Published:
Soviet mining science Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Literature Cited

  1. M. G. Novozhilov et al., The Technology of Open-Cut Mining [in Russian], Pt. 2, Nedra, Moscow (1971).

    Google Scholar 

  2. R. Aris, Discrete Dynamic Programming [Russian translation], Mir, Moscow (1969).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 58–62, January–February, 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Panchenko, A.A., Napadailo, V.A. A method of compiling a schedule of intraquarry truck transport. Soviet Mining Science 10, 51–55 (1974). https://doi.org/10.1007/BF02501606

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02501606

Keywords

Navigation