A method of compiling a schedule of intraquarry truck transport

This is a preview of subscription content, access via your institution.

Literature Cited

  1. 1.

    M. G. Novozhilov et al., The Technology of Open-Cut Mining [in Russian], Pt. 2, Nedra, Moscow (1971).

    Google Scholar 

  2. 2.

    R. Aris, Discrete Dynamic Programming [Russian translation], Mir, Moscow (1969).

    Google Scholar 

Download references

Authors

Additional information

Artem Dnepropetrovsk Mining Institute. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 58–62, January–February, 1974.

Rights and permissions

Reprints and Permissions

About this article

Cite this article

Panchenko, A.A., Napadailo, V.A. A method of compiling a schedule of intraquarry truck transport. Soviet Mining Science 10, 51–55 (1974). https://doi.org/10.1007/BF02501606

Download citation

Keywords

  • Load Capacity
  • Motor Transport
  • Dump Truck
  • Dynamic Programming Problem
  • Railroad Train