Advertisement

Marine Systems & Ocean Technology

, Volume 14, Issue 1, pp 23–33 | Cite as

Feasibility of measurement-assisted assembly of ship hull blocks

  • Mauricio de Campos PorathEmail author
  • Roberto Simoni
  • Raquel de Araujo Nunes
  • Adriano Bertoldi
Article
  • 20 Downloads

Abstract

Quality and productivity enhancement of large-scale assembly processes in ship construction can be obtained by introducing measurement-assisted assembly (MAA). MAA consists in using advanced 3D measurement systems to enable direct, fast and sometimes even automatic part-to-part assembly without iteration. This experimental research project aims to develop, demonstrate and evaluate the MAA concept for the assembly of hull blocks of medium- and large-sized vessels. An indoor GPS (iGPS) and a robotic total station are used as measurement systems. Experiments have been carried out to evaluate aspects related to metrological performance, functionality and robustness of the measurement systems. An automatic MAA process was simulated with a Stewart Platform. The results indicate that MAA is generally applicable to the assembly of ship hulls and that both iGPS and robotic total station are suitable measurement systems for this application. The advantages and drawbacks of both systems are discussed.

Keywords

Large-scale metrology Measurement-assisted assembly Shipbuilding Total station Indoor-GPS Stewart Platform 

Notes

Acknowledgements

The authors thank Conselho Nacional de Desenvolvimento Cíentfico e Tecnológico (CNPq) for the financial support.

References

  1. 1.
    D.J. Eyres, G.J. Bruce, Ship Construction, 7th edn. (Butterworth-Heinemann, Oxford, 2012)Google Scholar
  2. 2.
    P.G. Maropoulos, J.E. Muelaner, M.D. Summers, O.C. Martin, A new paradigm in large scale assembly—research priorities in measurement assisted assembly. Int. J. Adv. Manuf. Technol. 70, 621–623 (2014)CrossRefGoogle Scholar
  3. 3.
    G. Mosqueira, J. Apetz, K.M. Santos, E. Villani, R. Suterio, L.G. Trabasso, Analysis of the indoor GPS system as feedback for the robotic alignment of fuselages using laser radar measurements as comparison. Robot. Comput. Integr. Manuf. 28(6), 700–709 (2012).  https://doi.org/10.1016/j.rcim.2012.03.004 CrossRefGoogle Scholar
  4. 4.
    R. Schmitt, W. Kimmelmann, S. Quinders, C. Storm, F. Oberhansberg, Investigation of the applicability of an iGPS metrology system to automate the assembly in motion of a truck cabin. Appl. Mech. Mater. 840, 58–65 (2016).  https://doi.org/10.4028/www.scientific.net/AMM.840.58 CrossRefGoogle Scholar
  5. 5.
    G. Heiden, M.D.C. Porath, Metrological performance of iGPS in measurement assisted assembly processes. J. Phys. Conf. Ser. 012036, 1–7 (2015).  https://doi.org/10.1088/1742-6596/733/1/012036 Google Scholar
  6. 6.
    M.D.C. Porath, R. Simoni, A.M. Giovanoni, J.R. Amaral, Field evaluation of a hull block assembly process assisted by advanced optical 3D measurement systems. In: Annals of the 26o Congresso Nacional de Transporte Aquaviario, Construção Naval e Offshore—SOBENA 2016, Rio de Janeiro (2016)Google Scholar
  7. 7.
    C. Depenthal, J. Schwendemann, IGPS—a New system for static and kinematic measurements, optical 3-D measurement techniques IX I (2009), pp. 131–140Google Scholar
  8. 8.
    F. Franceschini, M. Galetto, D. Maisano, L. Mastrogiacomo, B. Pralio, Distributed Large-Scale Dimensional Metrology (Springer, London, 2011)CrossRefzbMATHGoogle Scholar
  9. 9.
    S.H. Moon, P. Cunliffe, Implementing iGPS for large-volume metrology in South Korean shipbuilding applications three-dimensional measurement helps solve the really big problems, quality digest (2008). https://www.qualitydigest.com/inside/cmsc-article/implementing-igps-large-volume-metrology-south-korean-shipbuilding-applications
  10. 10.
    Nikon Corporation, iGPS: Modular positioning, tracking and measurement system for factory-wide deployment (2017). http://www.nikon.com/products/industrial-metrology/lineup/large_volume/igps/
  11. 11.
    A.R. Norman, A. Schönberg, I.A. Gorlach, R. Schmitt, Validation of iGPS as an external measurement system for cooperative robot positioning. Int. J. Adv. Manuf. Technol. 64(1–4), 427–446 (2013).  https://doi.org/10.1007/s00170-012-4004-8 CrossRefGoogle Scholar
  12. 12.
    M. Scherer, J.L. Lerma, From the conventional total station to the prospective image assisted photogrammetric scanning total station: comprehensive review. J. Surv. Eng. 135(4), 173–178 (2009).  https://doi.org/10.1061/(ASCE)0733-9453(2009)135:4(173), https://ascelibrary.org/doi/10.1061/%28ASCE%290733-9453%282009%29135%3A4%28173%29 CrossRefGoogle Scholar
  13. 13.
    R. Schmitt, M. Peterek, E. Morse, W. Knapp, M. Galetto, F. Härtig, G. Goch, B. Hughes, A. Forbes, W. Estler, Advances in large-scale metrology review and future trends. CIRP Ann. Manuf. Technol. (2016).  https://doi.org/10.1016/j.cirp.2016.05.002, http://linkinghub.elsevier.com/retrieve/pii/S0007850616301895
  14. 14.
    International Organization for Standardization, ISO 17123-4:2012 Optics and optical instruments—field procedures for testing geodetic and surveying instruments—part 4: Electro-optical distance meters (EDM measurements to reflectors), 2nd edn. (2012)Google Scholar
  15. 15.
    Leica Geosystems AG, Leica Viva TS12 robotic datasheet (2012). http://www.geotx.com/pdf/Leica_Viva_TS12.pdf
  16. 16.
    J.E. Muelaner, Z. Wang, O. Martin, J. Jamshidi, P.G. Maropoulos, Estimation of uncertainty in three-dimensional coordinate measurement by comparison with calibrated points. Meas. Sci. Technol. 21(2), 25106 (2010).  https://doi.org/10.1088/0957-0233/21/2/025106 CrossRefGoogle Scholar
  17. 17.
    HugeIron Tech Co., Ltd., Shipyard Transporters (2018). http://www.sinotrailers.com/shipyard-transporters

Copyright information

© Sociedade Brasileira de Engenharia Naval 2019

Authors and Affiliations

  1. 1.Laboratory of Industrial GeodesyFederal University of Santa CatarinaJoinvilleBrazil

Personalised recommendations