Advertisement

Optimisation of binder alternative for cemented paste fill in underground metal mines

  • Prashant SinghEmail author
  • Chandra Nath Ghosh
  • Santosh Kumar Behera
  • Kanhaiya Mishra
  • Dhirendra Kumar
  • John Buragohain
  • Phanil Kumar Mandal
Original Paper
  • 17 Downloads

Abstract

To maximise ore recovery safely and economically, a proper backfill design of required strength is imperative to facilitate extraction of adjacent stopes. Ordinary Portland cement (OPC) has a direct impact on the strength gained by the paste fill mix and is also a major contributor to the backfilling cost. This has prompted the users to go for partial replacement of OPC with readily available industrial wastes such as fly ash and jarosite to obtain a paste mix of desired strength. This paper highlights the use of a mathematical model to predict the strength requirement (unconfined compressive strength and cohesion) of self-supporting paste fill for secondary pillar extraction of stopes in metal mines. This paper also highlights extensive laboratory investigation carried out for partial replacement of OPC with fly ash and jarosite to map the changes in the strength of paste mix with time. Initially, the percentage of OPC required to achieve the designed strength was evaluated and subsequently, the percentage of OPC in the mix was replaced gradually with fly ash and jarosite. Laboratory results indicated that the strength of the paste mix increases with curing period (7, 14, 28 and 56 days) and the chemical composition of the ingredients also played a major role in strength development. The results were then compared with the required strength predicted from the model to obtain proper paste mix for existing mine’s stope dimension.

Keywords

Mill tailings OPC Fly ash Jarosite Paste fill Chemical composition UCS Cohesion 

Notes

Acknowledgements

The authors would like to express their gratitude to HZL management for supplying mill tailings, Jarosite and fly ash for the study.

Funding information

The present study is conducted with the financial support from HZL.

References

  1. Abdul-Hussain N, Fall M (2011) Unsaturated hydraulic properties of cemented tailings backfill that contains sodium silicate. Eng Geol 123:288–301.  https://doi.org/10.1016/j.enggeo.2011.07.011 CrossRefGoogle Scholar
  2. Belem T, Benzaazoua M (2004) An overview on the use of paste fill technology as a ground support method in cut and fill mines. Ground Support in Mining and Underground Construction– Villaescusa & Potvin, Taylor & Francis Group, London. ISBN 90(5809):6408Google Scholar
  3. CEA Report (2018) Report on fly ash generation at coal/lignite based thermal power station and its utilization in the country for the year 2017-18, New Delhi. http://www.cea.nic.in/reports/others/thermal/tcd/flyash_201617.pdf. Accessed 20 February 2019
  4. Célestin JC H., Fall M, (2009) Thermal conductivity of cemented paste backfill material and factors affecting it. International Journal of Mining, Reclamation and Environment 23 (4):274–290.  https://doi.org/10.1080/17480930902731943 CrossRefGoogle Scholar
  5. Ercikdi B, Cihangir F, Kesimal A, Deveci (2017) Practical importance of tailings for cemented paste backfill. In: Yilmaz E & Fall M (ed) Paste Tailings Management, Springer, pp 7-32Google Scholar
  6. Fall M, Benzaazoua M, Ouellet S (2005) Experimental characterization of the effect of tailings fineness and density on the quality of cemented paste backfill. Miner Eng 18:41–44.  https://doi.org/10.1016/j.mineng.2012.04.008 CrossRefGoogle Scholar
  7. Farkish A, Fall M (2013) Rapid dewatering of oil sands mature fine tailings using super absorbent polymer. Miner Eng 50–51:38–47.  https://doi.org/10.1016/j.mineng.2013.06.002 CrossRefGoogle Scholar
  8. Hassani F, Archibald J (1998) Mine backfill. In: Canadian Institute of Mine, Metallurgy and Petroleum, Published on CD-ROM Proceedings, Canada, p 263Google Scholar
  9. Helsinki M, Fourie A, fahey M, Ismail M (2007) Assessment of the self-desiccation process in cemented mine back fills. Can Geotech J 44:1148–1156.  https://doi.org/10.1139/T07-051 CrossRefGoogle Scholar
  10. Indian Mineral Yearbook (2017) Coal and lignite IBM Publishing. https://ibm.gov.in/writereaddata/files/03202018145834Coal%20and%20Lig_AR_2017.pdf. Accessed 20 February 2019
  11. IS 13047: Indian Standards, Method for determination of strength of rock materials in triaxial compression 1991 Retrieved from web site: https://archive.org/details/gov.in.is.13047.1991. Accessed 18 September 2016
  12. IS 9143: Indian Standards, Method for the determination of unconfined compressive strength of rock materials, 1979. Retrieved from web site: https://archive.org/details/gov.in.is.9143.1979. Accessed 15 September 2016
  13. Kesimal A, Yilmaz E, Ercikdi B, Alp I, Deveci H (2005) Effect of properties of tailings and binder on the short and long term strength and stability of cemented paste backfill. Mater Lett 59(28):3703–3709CrossRefGoogle Scholar
  14. Li L, Michel A (2012) A modified solution to assess the required strength of exposed backfill in mine stopes. Can Geotech J 49:994–1002.  https://doi.org/10.1139/t2012-056 CrossRefGoogle Scholar
  15. Li L, Pengyu Y (2015) A numerical evaluation of continuous backfilling in cemented paste backfilled stope through an application of wick drains. Int J Min Sci Technol 25:897–904.  https://doi.org/10.1016/j.ijmst.2015.09.004 CrossRefGoogle Scholar
  16. Mahlaba JS, Kearsley EP, Kruger RA, Pretorius PC (2011) Evaluation of workability and strength development of fly ash pastes prepared with industrial brines rich in and Cl- to expand brine utilisation. Miner Eng 24:1077–1081.  https://doi.org/10.1016/j.mineng.2011.05.015 CrossRefGoogle Scholar
  17. Mitchel RJ, Olsen RS, Smith JD (1982) Model studies on cemented tailings used in mine backfilling. Can Geotech J 19:14–28.  https://doi.org/10.1139/t82-002 CrossRefGoogle Scholar
  18. Nieminen P, Seppanen P (1983) The use of blast-furnace slag and other by-products as binding agents in consolidated backfilling at Outokumpu Oy’s mines. In: Granholm S (ed) Mining with backfill. Lulea University of Technology, Sweden, pp 49–58Google Scholar
  19. Potvin Y, Thomas EH, Fourie AB (2005) Handbook on mine fill. Australian Centre for Geomechanics, WAGoogle Scholar
  20. Ritcey GM (2005) Tailings management in gold plants. Hydrometallurgy 78:3–20CrossRefGoogle Scholar
  21. Surabhi (2017) Fly ash in India: Generation vis-à-vis utilization and global perspective. Int J Appl Chem 13:29–52Google Scholar
  22. Tiwari MK, Bajpai S, Dewangan UK (2016) Fly ash utilization: a brief review in Indian context. Int Res J of Eng and Tech (IRJET) 3:949–956Google Scholar
  23. Yao ZT, Ji XS, Sarker PK, Tang JH, Ge LQ, Xia MS, Xia YQ (2015) A comprehensive review on the application of coal fly ash. Earth-Sci Rev 141:105–121.  https://doi.org/10.1016/j.earscirev.2014.11.016 CrossRefGoogle Scholar

Copyright information

© Saudi Society for Geosciences 2019

Authors and Affiliations

  • Prashant Singh
    • 1
    Email author
  • Chandra Nath Ghosh
    • 1
  • Santosh Kumar Behera
    • 1
  • Kanhaiya Mishra
    • 1
  • Dhirendra Kumar
    • 1
  • John Buragohain
    • 1
  • Phanil Kumar Mandal
    • 1
  1. 1.CSIR - Central Institute of Mining and Fuel ResearchDhanbadIndia

Personalised recommendations