A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates

  • 170 Accesses

  • 1 Citations

Abstract

We consider the problem of minimizing the sum of completion times in a two-machine permutation flowshop problem subject to release dates. We derive several lower bounds as well as a branch-and-bound algorithm for the problem under consideration. Computational experiments, on a large set of randomly generated instances, provide evidence that the proposed procedure performs consistently well.

This is a preview of subscription content, log in to check access.

We’re sorry, something doesn't seem to be working properly.

Please try refreshing the page. If that doesn't work, please contact support so we can address the problem.

References

  1. Akkan C, Karabati S (2004) The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm. Eur J Oper Res 159(2):420–429

  2. Baker KR (1974) Introduction to sequencing and scheduling. Wiley, New York

  3. Bansal SP (1977) Minimizing the sum of completion times of n jobs over m machines in a flow shop. Am Inst Ind Eng Trans 9(3):306–311

  4. Chalghoumi S, Mehdi M, Ladhari T (2013) A new lower bound for minimising the total completion time in a two-machine flow shop under release dates. In: IEEE international conference on modeling, simulation and applied optimization, Hammamet, April 28–30, 2013, pp 1–4

  5. Chung CS, Flynn J, Kirca O (2002) A branch-and-bound algorithm to minimize the total flow time for m-machine permutation flowshop problems. Int J Prod Econ 79(3):185–196

  6. Della Croce F, Narayan V, Tadei R (1996) The two-machine total completion time flowshop problem. Eur J Oper Res 90(2):227–237

  7. Della Croce F, Ghirardi M, Tadei R (2002) An improved branch-and-bound algorithm for the two machine total completion time flowshop problem. Eur J Oper Res 139(2):293–301

  8. Della Croce F, T’Kindt V (2003) Improving the preemptive bound for the one-machine dynamic total completion time scheduling problem. Oper Res Lett 31(2):142–148

  9. French S (1982) Sequencing and scheduling: an introduction to the mathematics of the job-shop. Ellis Horwood, Chichester

  10. Harchol-Balter H, Bansal N, Schroeder B, Agrawal M (2001) SRPT Scheduling for web servers. Lecture notes in computer science, chapter in job scheduling strategies for parallel processing. Springer, pp 11–20

  11. Haouari M, Kharbeche M (2013) An assignment-based lower bound for a class of two-machine flow shop problems. Comput Oper Res 40(7):1693–1699

  12. Hoogeveen JA, Van de Velde S (1995) Minimizing total completion and maximum cost simultaneously is solvable in polynomial time. Oper Res Lett 17(5):205–208

  13. Hoogeveen H, Van Norden L, Van de Velde S (2006) Lower bounds for minimizing total completion time in a two-machine flow shop. J Sched 9(6):559–568

  14. Ignall E, Schrage L (1965) Application of the branch-and-bound technique to some flowshop scheduling problems. Oper Res 13(3):400–412

  15. Jouglet A, Baptiste P, Carlier J (2004) Branch-and-bound algorithms for total weighted tardiness. In: Leung JYT (ed) Handbook of scheduling: algorithms, models and performance analysis. CRC Press, FL, USA

  16. Kellerer H, Tautenhahn T, Woeginger GJ (1999) Approximability and non approximability results for minimizing total flow time on a single machine. SIAM J Comput 28(4):1155–1166

  17. Kooli A, Serairi M (2013) An assignment based lower bound for the single machine with unequal release dates. In: 11th Workshop on models and algorithms for planning and scheduling problems, Pont à Mousson, 23–28 June, 2013

  18. Kooli A, Serairi M (2014) A mixed integer programming approach for the single machine problem with unequal release dates. Comput Oper Res 51:323–330

  19. Ladhari T, Rakrouki MA (2009) Heuristics and lower bounds for minimizing the total completion time in a two-machine flowshop. Int J Prod Econ 122(2):678–691

  20. Leonardi S, Raz D (1997) Approximating total flow time on parallel machines. J Comput Syst Sci 73(6):875–891

  21. Nawaz M, Enscore EE, Ham I (1983) A heuristic algorithm for the \(m\)-machine, \(n\)-job flow-shop sequencing problem. OMEGA 11(1):91–96

  22. Pinedo M (2008) Scheduling: theory, algorithms, and systems. Springer, New York

  23. Potts CN, Van Wassenhove LN (1985) A branch-and-bound algorithm for the total weighted tardiness problem. Oper Res 33(2):363–377

  24. Rakrouki MA, Ladhari T (2009) A branch-and-bound algorithm for minimizing the total completion time in two-machine flowshop problem subject to release dates. In: IEEE international conference on computers & industrial engineering, University of Technology of Troyes, July 6–8, 2009, pp 80–85

  25. Rinnooy Kan AHG (1976) Machine sequencing problem: classification, complexity and computation. Nijhoff, The Hague

  26. Szwarc W (1983) The flow shop problem with mean completion time criterion. IIE Trans 15(2):172–176

  27. T’Kindt V, Della Croce F, Esswein C (2004) Revisiting branch and bound search strategies for machine scheduling problems. J Sched 7(6):429–440

  28. Van de Velde S (1990) Minimizing the sum of job completion times in the two-machine flowshop by Lagrangian relaxation. Ann Oper Res 26(1):257–268

Download references

Author information

Correspondence to Anis Kooli.

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Rakrouki, M.A., Kooli, A., Chalghoumi, S. et al. A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates. Oper Res Int J 20, 21–35 (2020). https://doi.org/10.1007/s12351-017-0308-7

Download citation

Keywords

  • Flowshop
  • Release dates
  • Total completion time
  • Branch-and-bound