Advertisement

KSCE Journal of Civil Engineering

, Volume 23, Issue 4, pp 1436–1441 | Cite as

RSVRs based on Feature Extraction: A Novel Method for Prediction of Construction Projects’ Costs

  • Ying Zhang
  • Shutian FangEmail author
Construction Management
  • 9 Downloads

Abstract

The construction industry is an important basis for the development of China’s economy. The accurate prediction of the cost of the project determines the profitability of the project and the decision-making of the construction. Therefore, this paper combines Random Forest with Support Vector Regression, and puts forward a method of construction cost prediction based on this method which we call it Random Support Vector Regressions (RSVRs). In this paper, 22 kinds of features which are related to cost are extracted, then we use Kernel Principal Component Analysis to fuse features which are less relevant to the cost. Then 11-dimensional features are put into RSVRs for modeling. From the theoretical point of view, RSVRs gives a novel work flow that is fusing features with low correlation firstly and then performing regression. In order to avoid the defects of the regression method, the two methods are fused, so that each method can maximize its advantages and make up for the disadvantages of the other method. From a practical point of view, RSVRs can be used to predict the project cost, which not only improves the accuracy, but also immediately obtains the predicted result. As long as the appropriate training data is selected, the method can predict the cost of any area and any building.

Keywords

construction project’s cost prediction support vector regression random forest kernel principal component analysis feature fusion 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Adeli, H. and Wu, M. (1998). “Regularization neural network for construction cost estimation.” Journal of Construction Engineering & Management, Vol. 124, No. 1, pp. 18–24, DOI:  https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(18).CrossRefGoogle Scholar
  2. Ahmad, A. S., Hassan, M. Y., Abdullah, M. P., Rahman, H. A., Hussin, F., Abdullah, H., and Saidur, R. (2014). “A review on applications of ANN and SVM for building electrical energy consumption forecasting.” Renewable & Sustainable Energy Reviews, Vol. 33, No. 2, pp. 102–109, DOI:  https://doi.org/10.1016/j.rser.2014.01.069.CrossRefGoogle Scholar
  3. Ahn, B. S., Cho, S. S., and Kim, C. Y. (2000). “The integrated methodology of rough set theory and artificial neural network for business failure prediction.” Expert Systems with Applications, Vol. 18, No. 2, pp. 65–74, DOI:  https://doi.org/10.1016/s0957-4174(99)00053-6.CrossRefGoogle Scholar
  4. Ansari, H. R., Zarei, M. J., Sabbaghi, S., and Keshavarz, P. (2018). “A new comprehensive model for relative viscosity of various nanofluids using feed-forward back-propagation MLP neural networks.” International Communications in Heat & Mass Transfer, Vol. 91, pp. 158–164, DOI:  https://doi.org/10.1016/j.icheatmasstransfer.2017.12.012.CrossRefGoogle Scholar
  5. Babatunde, Y. and Sui, P. L. (2015). “Construction industry in China.” Springer Singapore, Vol. 2015, pp. 31–43, DOI:  https://doi.org/10.1007/978-981-287-362-0_3.Google Scholar
  6. Bayram, S., Ocal, M. E., Oral, E. L., and Atis, C. D. (2016). “Comparison of Multi Layer Perceptron (MLP) and Radial Basis Function (RBF) for construction cost estimation: the case of Turkey.” Statyba, Vol. 22, No. 4, pp. 480–490, DOI:  https://doi.org/10.3846/13923730.2014.897988.Google Scholar
  7. Breiman, L. (2001). “Random forests.” Machine Learning, Vol. 45, No. 1, pp. 5–32, DOI:  https://doi.org/10.1023/A:1010933404324.CrossRefzbMATHGoogle Scholar
  8. Chang, C.-C. and Lin, C.-J. (2001). “LIBSVM: A library for support vector machines.” ACM Transactions on Intelligent Systems and Technology, Vol. 2, No. 3, pp. 1–27, DOI:  https://doi.org/10.1145/1961189.1961199.CrossRefGoogle Scholar
  9. Dong, S. K., Sang, M. L., and Park, J. S. (2006). “Building lightweight intrusion detection system based on random forest.” Lecture Notes in Computer Science, Vol. 3973, pp. 224–230, DOI:  https://doi.org/10.1007/11760191_33.CrossRefGoogle Scholar
  10. Hwang, B., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). “Measuring the impact of rework on construction cost performance.” Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187–198, DOI:  https://doi.org/10.1061/(asce)0733-9364(2009)135:3(187).CrossRefGoogle Scholar
  11. Kong, F., Wu, X., and Cai, L. (2008). “Application of RS-SVM in construction project cost forecasting.” Proc., International Conference on Wireless Communications, NETWORKING and Mobile Computing, Vol. 2008, pp. 1–4, DOI:  https://doi.org/10.1109/wicom.2008.1290.Google Scholar
  12. Ma, Z., Wei, Z., Wu, S., and Zhe, L. (2011). “Application and extension of the IFC standard in construction cost estimating for tendering in China.” Automation in Construction, Vol. 20, No. 2, pp. 196–204, DOI:  https://doi.org/10.1016/j.autcon.2010.09.017.CrossRefGoogle Scholar
  13. Ortiz, O., Castells, F., and Sonnemann, G. (2009). “Sustainability in the construction industry: A review of recent developments based on LCA.” Construction and Building Materials, Vol. 23, No. 1, pp. 28–39, DOI:  https://doi.org/10.1016/j.conbuildmat.2007.11.012.CrossRefGoogle Scholar
  14. Phuc, D. and Phung, N. T. K. (2007). “Using naïve bayes model and natural language processing for classifying messages on online forum.” Proc., IEEE International Conference on Research, Innovation and Vision for the Future, pp. 247–252, DOI:  https://doi.org/10.1109/rivf.2007.369164.CrossRefGoogle Scholar
  15. Polat, G. (2012). “ANN approach to determine cost contingency in international construction project.” Journal of Applied Management & Investments, Vol. 1, No. 2, pp. 195–201, DOI:  https://doi.org/10.5130/ajceb.v3i1.2906.Google Scholar
  16. Sun, W. (2013). “Comprehensive evaluation of grid project cost items based on fuzzy SVM.” Journal of Information & Computational Science, Vol. 10, No. 13, pp. 4067–4075, DOI:  https://doi.org/10.12733/jics20102092.CrossRefGoogle Scholar
  17. Wang, X. (2018). “Forecasting construction project cost based on BP neural network.” Proceedings from 10th International Conference on Measuring Technology and Mechatronics Automation, IEEE, pp. 420–423, DOI:  https://doi.org/10.1109/icmtma.2018.00109.Google Scholar
  18. Wang, X. J., Zhang, X. H., and Ling, W. X. (2000). “Research on Bayes method for estimating project cost.” Journal of Wuhan University of Hydraulic & Electric Engineering, pp. 23–29, DOI:  https://doi.org/10.3969/j.issn.1671-8844.2000.03.028.Google Scholar
  19. Williams, T. P. (2002). “Predicting completed project cost using bidding data.” Construction Management & Economics, Vol. 20, No. 3, pp. 225–235, DOI:  https://doi.org/10.1080/01446190110112838.CrossRefGoogle Scholar
  20. Xue, X., Shen, Q., Wang, Y., and Lu, J. (2008). “Measuring the productivity of the construction industry in china by using DEA-based malmquist productivity indices.” Journal of Construction Engineering & Management, Vol. 134, No. 1, pp. 64–71, DOI:  https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(64).CrossRefGoogle Scholar
  21. Yang, L., Dai, Y. L., Nan, L. I., and Management, S. O. (2014). “A forecasting method for project cost probability at completion based on monte carlo simulation.” Computer Simulation, pp. 38–43, DOI:  https://doi.org/10.3969/j.issn.1006-9348.2014.09.066.Google Scholar

Copyright information

© Korean Society of Civil Engineers 2019

Authors and Affiliations

  1. 1.Dept. of Architecture and EngineeringHeilongjiang PolytechnicHarbinChina
  2. 2.College of Civil and Architectural EngineeringHeilongjiang Institute of TechnologyHarbinChina

Personalised recommendations