Skip to main content
Log in

Risk assessment of contractor support based on improved risk matrix method

  • Published:
Journal of Shanghai Jiaotong University (Science) Aims and scope Submit manuscript

Abstract

For the current situation that the application of risk matrix method may result in too many risk ties which will block risk management and decision making, and based on the brief introduction of risk matrix method, this paper subdivides the risk levels, gives an improved risk matrix method, conducts risk assessment of contractor support using the improved risk matrix method, and determines the risk rates and the acceptable level.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Xu Xian-hao, Tang Ze-lin. Risk assessment of logistics outsourcing based on risk matrix [J]. Logistics Technology, 2006 (5): 67–69 (in Chinese).

    Google Scholar 

  2. Zhang Fu-yuan. Study on the risk management of high-tech equipment contractor support [R]. Shijiazhuang: Shijiazhuang New Technology Application Institute, 2011 (in Chinese).

    Google Scholar 

  3. Zhu Qi-chao, Kuang Xing-hua, Shen Yong-ping. Risk matrix method and its application [J]. Engineering Sciences, 2003, 5(1): 89–94 (in Chinese).

    Google Scholar 

  4. Xu Shu, Hu Ming-ming, Li Zi-ru. The application of risk matrix method in risk assessment of business outsourcing [J]. Modernization of Management, 2004 (2): 13–16 (in Chinese).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Fu-yuan Zhang  (张福元).

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhang, Fy., Li, Dy., Geng, B. et al. Risk assessment of contractor support based on improved risk matrix method. J. Shanghai Jiaotong Univ. (Sci.) 20, 464–467 (2015). https://doi.org/10.1007/s12204-015-1650-7

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12204-015-1650-7

Keywords

CLC number

Navigation