This article presents the challenges encountered during the stability analysis and stabilization of two Himalayan rock slopes supporting the Chenab Railway Bridge in India, which will be the highest railway bridge in the world after completion. Owing to the importance of the project, extensive geological investigations, in situ and laboratory tests were carried out using conventional and advanced methods to evaluate various intact rock, rock joints, rock mass properties and rock mass quality present at the site. Once the conclusive results were made regarding these properties, stability of slopes were evaluated against both structurally controlled and stress-controlled failures using the developed probabilistic approach due to the presence of high variability in intact rock, rock mass and rock joints properties. It was observed that while the slopes were stable against stress-controlled failures, the possibility of structurally controlled failures exists as observed in the probabilistic approach in which the conventional deterministic approach was not able to detect. Different stabilization measures, i.e. rock bolts, slope flattening, grouting, drainage and shotcreting, were designed at the site to reduce the probability of failures for the slopes, deformability of rocks present due to cavities and high aperture joints, shallow block failures along the slope surface and pore-pressure build-up. To check the efficiency of the stabilization measures, cross-hole seismic tomography is carried out at the site and further in situ measured displacements are compared with the displacements estimated using the developed probabilistic approach. The case study used in this paper is a real-time ongoing bridge project of global interest and the data and analysis presented will be of great benefit to the researchers and practitioners working on similar problems.

Keywords

Rock slopes Site-investigation Probabilistic analysis Stabilization Monitoring 

Supplementary material

10064_2019_1602_MOESM1_ESM.jpg (1 mb)
ESM 1 (JPG 1048 kb)
10064_2019_1602_MOESM2_ESM.jpg (2.2 mb)
ESM 2 (JPG 2238 kb)

References

  1. Ahmdabadi M, Poisel R (2015a) Assessment of the application of point estimate methods in the probabilistic stability analysis of slopes. Comput Geotech 69:540–550CrossRefGoogle Scholar
  2. Ahmdabadi M, Poisel R (2015b) Probabilistic analysis of rock slopes involving correlated non-normal variables using point estimate methods. Rock Mech Rock Eng 49(3):909–925CrossRefGoogle Scholar
  3. Bhasin R, Kaynia AM (2004) Static and dynamic simulation of a 700 m high rock slope in western Norway. Eng Geol 71:213–226CrossRefGoogle Scholar
  4. Bieniawski ZT (1978) Determining rock mass deformability: experience from case histories. Int J Rock Mech Min Sci Geomech Abstr 15:237–247CrossRefGoogle Scholar
  5. Dai SH, Wang MO (1992) Reliability analysis in engineering applications. Reinhold, New YorkGoogle Scholar
  6. Duzgun HSB, Bhasin RK (2009) Probabilistic stability evaluation of Oppstadhornet rock slope, Norway. Rock Mech Rock Eng 42:729–749CrossRefGoogle Scholar
  7. Fisher SR (1953) Dispersion on a sphere. Proc R Soc Lond A Math Phys Sci 217:295–305CrossRefGoogle Scholar
  8. GSI (1989) Geological survey of India. Special Publication no, 26Google Scholar
  9. Hoek E (1983) Strength of jointed rock masses. Géotechnique 23(3):187–223CrossRefGoogle Scholar
  10. Hoek E (2007) Practical rock engineering. Hoek’s corner. Rocscience Inc., OntarioGoogle Scholar
  11. Hoek E, Brown ET (1988) The Hoek-Brown failure criterion-a 1988 update. In: Proceedings of 15th Canadian Rock Mechanics Symp,TorontoGoogle Scholar
  12. Hoek E, Carranza-Torres C, Corkum B(2002) Hoek–Brown failure criterion-2002 edition. In: Proceedings of Int. Conf. Fifth North American Rock Mechanics Symposium, TorontoGoogle Scholar
  13. Hoek E, Diederichs MS (2006) Empirical estimation of rock mass modulus. Int J Rock Mech Min Sci 43:203–215CrossRefGoogle Scholar
  14. Hong HP (1998) An efficient point estimate method for probabilistic analysis. Reliab Eng System Saf 59:261–267CrossRefGoogle Scholar
  15. Hudson AJ, Harrison JP (1997) Engineering rock mechanics-an introduction to the principles. Elsevier, OxfordGoogle Scholar
  16. Indraratna B, Jayanathan M (2005) Measurement of pore water pressure of clay-infilled rock joints during triaxial shearing. Geotechnique 55(10):759–764CrossRefGoogle Scholar
  17. IS 1893 (2002) Criteria for earthquake resistant design of structures. Indian Standard Code by Bureau of Indian Standards, New DelhiGoogle Scholar
  18. ISRM (1981) Rock characterizition, testing and monitoring. In: Brown ET (ed) ISRM suggested methods. Pergamon, New YorkGoogle Scholar
  19. Kemeny J, Post R (2003) Estimating three-dimensional rock discontinuity orientation from digital images of fracture traces. Comput Geosci-UK 29:65–77CrossRefGoogle Scholar
  20. Kulatilake PHSW (1985) Fitting Fisher distributions to discontinuity orientation data. J Geol Educ 33:266–269CrossRefGoogle Scholar
  21. Lichtenstein S, Newman JR (1967) Empirical scaling of common verbal phrases associated with numerical probabilities. Psychon Sci 9(10):563–564CrossRefGoogle Scholar
  22. Mantrala S, Verma AK, Sitharam TG (2018) A systematic approach for the analyses and design of jointed rock mass slopes against wedge and toppling failures: a case study of the stability of the abutments of the bridge across the Chenab River. Int J Geotech Eng.  https://doi.org/10.1080/19386362.2018.1480151
  23. Nicholson GA, Bieniawski ZT (1990) A nonlinear deformation modulus based on rock mass classification. Int J Min Geol Eng 8:181–202CrossRefGoogle Scholar
  24. Palisade Co. (2015) @RISK, v 7.5. Palisade Corporation. https://www.palisade.com/Google Scholar
  25. Palmstrom A, Singh RB (2001) The deformation modulus of rock masses-comparisons between in situ tests and indirect estimates. Tunn Undergr Space Technol 16(3):115–131CrossRefGoogle Scholar
  26. Papaliangas T, Hencher SR, Lumsden AC, Manolopoulou S (1993) The effect of frictional fill thickness on the shear strength of rock discontinuities. Int J Rock Mech Min Sci Geomech Abstr 30:81–91CrossRefGoogle Scholar
  27. Park HJ, Terry RW, Woo IK (2005) Probabilistic analysis of rock slope stability and random properties of discontinuity parameters, interstate highway 40, Western North Carolina, USA. Eng Geol 79:230–250CrossRefGoogle Scholar
  28. Park H, West TR (2001) Development for a probabilistic approach for rock wedge failure. Eng Geol 59:233–251CrossRefGoogle Scholar
  29. Priest SD (1993) Discontinuity analysis for rock engineering, vol 473. Chapman & Hall, LondonCrossRefGoogle Scholar
  30. Quinones-Rozo C (2010) Lugeon test interpretation, revisited. In: Proceedings of the collaborative Management of Integrated Watersheds, 30rd annual USSD (United States society on dams) conference. US Society on Dams, DenverGoogle Scholar
  31. Ramamurthy T (2004) A geo-engineering classification for rocks and rock masses. Int J Rock Mech Min Sci 41:89–101CrossRefGoogle Scholar
  32. Read SAL, Richards LR, Perrin ND (1999) Applicability of the Hoek-Brown failure criterion to New Zealand greywacke rocks. In: Proceedings of the Int. Cong on Rock Mech Paris, FranceGoogle Scholar
  33. Ribacchi R (2000) Mechanical tests on pervasively jointed rock material: insight into rock mass behaviour. Rock Mech Rock Eng 33(4):243–266CrossRefGoogle Scholar
  34. Rocscience (2014a) Dips version 6.015, graphical and statistical analysis of orientation data. Rocscience Inc., OntarioGoogle Scholar
  35. Rocscience (2014b) SWEDGE version 6.003, 3D surface wedge analysis for slopes. Rocscience Inc., OntarioGoogle Scholar
  36. Rocscience (2014c) Phase2 version 8.020, finite element analysis for excavations and slopes. Rocscience Inc., OntarioGoogle Scholar
  37. Rocscience (2014d) SLIDE version 6.003, 2D limit equilibrium slope stability analysis. Rocscience Inc., OntarioGoogle Scholar
  38. Rosenblueth E (1975) Point estimates for probability moments. Proceedings of the Conf. Natl. Acad. Sci, USACrossRefGoogle Scholar
  39. Sakurai S (2017) Back analysis in rock engineering. CRC/Balkema, LeidenCrossRefGoogle Scholar
  40. Serafim JL, Pereira JP (1983) Consideration of the geomechanics classification of Bieniawski. Proceedings of the Int. Sym. on Eng. Geol. Undergr. Const., Lisbon, PortugalGoogle Scholar
  41. Sonmez H, Gokceoglu C, Ulusay R (2004) Indirect determination of the modulus of deformation of rock masses based on the GSI system. Int J Rock Mech Min Sci 41:849–857Google Scholar
  42. Tiwari G, Latha GM (2016) Design of rock slope reinforcement: an Himalayan case study. Rock Mech Rock Eng 49(6):2075–2097CrossRefGoogle Scholar
  43. US Army Corps of Engineers (1999) Risk-based analysis in geotechnical engineering for support of planning studies, engineering and design. Rep. No. 20314–1000. Dept. of Army, Washington, D.C.Google Scholar
  44. Wolff TF (1996) Probabilistic slope stability in theory and practice. In: Proceedings of Conf. On uncertainty in the geologic environment. Uncertainty, MadisonGoogle Scholar
  45. Wyllie DC, Christopher WM (2005) Rock slope engineering. Spon, LondonGoogle Scholar
  46. Zheng J, Dang J, Yang X, Wei J, Zheng H, Cui Y (2014) An improved Monte Carlo simulation method for discontinuity orientations based on Fisher distribution and its program implementation. Comput Geotech 61:266–276CrossRefGoogle Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Department of Civil EngineeringIndian Institute of TechnologyKanpurIndia
  2. 2.Department of Civil EngineeringIndian Institute of ScienceBangaloreIndia

Personalised recommendations