Predicting tunnel boring machine performance through a new model based on the group method of data handling

  • Mohammadreza KoopialipoorEmail author
  • Sayed Sepehr Nikouei
  • Aminaton Marto
  • Ahmad Fahimifar
  • Danial Jahed Armaghani
  • Edy Tonnizam Mohamad
Original Paper

Abstract

The tunnel boring machine (TBM), developed within the past few decades, is designed to make the process of tunnel excavation safer and more economical. The use of TBMs in civil and mining construction projects is controlled by several factors including economic considerations and schedule deadlines. Hence, improved methods for estimating TBM performance are important for future projects. This paper presents a new model based on the group method of data handling (GMDH) for predicting the penetration rate (PR) of a TBM. In order to achieve this aim, after investigation of the most effective parameters of PR, rock quality designation, uniaxial compressive strength, rock mass rating, Brazilian tensile strength, weathering zone, thrust force per cutter and revolutions per minute were selected and measured to estimate TBM PR. A database composed of 209 datasets was prepared according to the mentioned model inputs and output. Then, based on the most influential factors of GMDH, a series of parametric investigations were carried out on the established database. In the following, five different datasets with different sets of training and testing were selected and used to construct GMDH models. Aside from that, five multiple regression (MR) models/equations were also proposed to predict TBM PR for comparison purposes. After that, a ranking system was used in order to evaluate the obtained results. As a result, performance prediction results of [i.e. coefficient of determination (R2) = 0.946 and 0.924, root mean square error (RMSE) = 0.141 and 0.169 for training and testing datasets, respectively] demonstrated a high accuracy level of GMDH model in estimating TBM PR. Although both methods are applicable for estimation of PR, GMDH is able to provide a higher degree of accuracy and can be introduced as a new model in this field.

Keywords

Tunnel boring machine Penetration rate Group method of data handling Multiple regression 

Notes

Acknowledgements

The authors wish to express their appreciation to Universiti Teknologi Malaysia for supporting this study and making it possible.

Compliance with ethical standards

Conflict of interest

The authors declare no conflict of interest.

References

  1. Ardalan H, Eslami A, Nariman-Zadeh N (2009) Piles shaft capacity from CPT and CPTu data by polynomial neural networks and genetic algorithms. Comput Geotech 36:616–625CrossRefGoogle Scholar
  2. Bamford WE (1984) Rock test indices are being successfully correlated with tunnel boring machine performance. In: Fifth Australian Tunnelling Conference: State of the Art in Underground Development and Construction; Preprints of Papers. Institution of Engineers, Australia, p 218Google Scholar
  3. Bejarbaneh BY, Bejarbaneh EY, Amin MFM et al (2016) Intelligent modelling of sandstone deformation behaviour using fuzzy logic and neural network systems. Bull Eng Geol Environ.  https://doi.org/10.1007/s10064-016-0983-2
  4. Benardos AG, Kaliampakos DC (2004) Modelling TBM performance with artificial neural networks. Tunn Undergr Sp Tech 19:597–605CrossRefGoogle Scholar
  5. Bruines P (1998) Neuro-fuzzy modeling of TBM performance with emphasis on the penetration rate. Mem Cent Eng Geol Netherlands, Delft 202Google Scholar
  6. Eftekhari M, Baghbanan A, Bayati M (2010) Predicting penetration rate of a tunnel boring machine using artificial neural network. In: ISRM International Symposium-6th Asian Rock Mechanics Symposium. International Society for Rock MechanicsGoogle Scholar
  7. Farlow SJ (1984) Self-organizing methods in modeling: GMDH type algorithms. Dekker, New YorkGoogle Scholar
  8. Farmer IW, Glossop NH (1980) Mechanics of disc cutter penetration. Tunnels Tunn 12:22–25Google Scholar
  9. Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Sp Tech 30:110–123CrossRefGoogle Scholar
  10. Fattahi H (2016) Adaptive neuro fuzzy inference system based on fuzzy c–means clustering algorithm, a technique for estimation of TBM penetration rate. Iran Univ Sci Technol 6:159–171Google Scholar
  11. Ghaleini EN, Koopialipoor M, Momenzadeh M, Sarafraz ME, Mohamad ET, Gordan B (2018) A combination of artificial bee colony and neural network for approximating the safety factor of retaining walls. Engineering with Computers, 1–12Google Scholar
  12. Ghasemi E, Yagiz S, Ataei M (2014) Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic. Bull Eng Geol Environ 73:23–35CrossRefGoogle Scholar
  13. Gholami M, Shahriar K, Sharifzadeh M, Hamidi JK (2012) A comparison of artificial neural network and multiple regression analysis in TBM performance prediction. In: ISRM Regional Symposium-7th Asian Rock Mechanics Symposium. International Society for Rock MechanicsGoogle Scholar
  14. Gong Q-M, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46:8–18CrossRefGoogle Scholar
  15. Gordan B, Jahed Armaghani D, Adnan AB, Rashid ASA (2016) A new model for determining slope stability based on seismic motion performance. Soil Mech Found Eng 53:344–351.  https://doi.org/10.1007/s11204-016-9409-1
  16. Graham PC (1976) Rock exploration for machine manufacturers. Exploration for Rock Engineering 1:173–180Google Scholar
  17. Grima MA, Bruines PA, Verhoef PNW (2000) Modeling tunnel boring machine performance by neuro-fuzzy methods. Tunn Undergr Sp Tech 15:259–269CrossRefGoogle Scholar
  18. Hasanipanah M, Noorian-Bidgoli M, Jahed Armaghani D, Khamesi H (2016a) Feasibility of PSO-ANN model for predicting surface settlement caused by tunneling. Eng Comput 32.  https://doi.org/10.1007/s00366-016-0447-0
  19. Hasanipanah M, Jahed Armaghani D, Monjezi M, Shams S (2016b) Risk assessment and prediction of rock fragmentation produced by blasting operation: a rock engineering system. Environ Earth Sci 75.  https://doi.org/10.1007/s12665-016-5503-y
  20. Hasanipanah M, Jahed Armaghani D, Amnieh HB, Koopialipoor M. Arab H (2018) A risk-based technique to analyze flyrock results through rock engineering system. Geotech Geol Eng 1–14.  https://doi.org/10.1007/s10706-018-0459-1
  21. Haykin S (1999) Neural networks: a comprehensive foundation. Prentice Hall, Upper Saddle RiverGoogle Scholar
  22. Ivakhnenko AG (1971) Polynomial theory of complex systems. IEEE Trans Syst Man Cybern 1:364–378CrossRefGoogle Scholar
  23. Jahed Armaghani D, Hajihassani M, Bejarbaneh BY, Marto A, Mohamad ET (2014) Indirect measure of shale shear strength parameters by means of rock index tests through an optimized artificial neural network. Measurement 55:487–498Google Scholar
  24. Jahed Armaghani D, Mohamad ET, Momeni E, Narayanasamy MS (2015) An adaptive neuro-fuzzy inference system for predicting unconfined compressive strength and Young’s modulus: a study on main range granite. Bull Eng Geol Environ 74:1301–1319Google Scholar
  25. Jahed Armaghani D, Mohamad ET, Hajihassani M, et al (2016a) Application of several non-linear prediction tools for estimating uniaxial compressive strength of granitic rocks and comparison of their performances. Eng Comput 32.  https://doi.org/10.1007/s00366-015-0410-5
  26. Jahed Armaghani D, Mohd Amin MF, Yagiz S et al (2016b) Prediction of the uniaxial compressive strength of sandstone using various modeling techniques. Int J Rock Mech Min Sci 85:174–186.  https://doi.org/10.1016/j.ijrmms.2016.03.018 CrossRefGoogle Scholar
  27. Jahed Armaghani D, Mohamad ET, Narayanasamy MS et al (2017a) Development of hybrid intelligent models for predicting TBM penetration rate in hard rock condition. Tunn Undergr Sp Tech 63:29–43.  https://doi.org/10.1016/j.tust.2016.12.009
  28. Jahed Armaghani D, Shoib RSNSBR, Faizi K, Rashid ASA (2017b) Developing a hybrid PSO–ANN model for estimating the ultimate bearing capacity of rock-socketed piles. Neural Comput Appl 28.  https://doi.org/10.1007/s00521-015-2072-z
  29. Jamali A, Nariman-Zadeh N, Darvizeh A et al (2009) Multi-objective evolutionary optimization of polynomial neural networks for modelling and prediction of explosive cutting process. Eng Appl Artif Intell 22:676–687CrossRefGoogle Scholar
  30. JAVAD G, NARGES T (2010) Application of artificial neural networks to the prediction of tunnel boring machine penetration rate. Min Sci Technol 20:727–733Google Scholar
  31. Jekabsons G, Lavendels J (2008) A comparison of heuristic methods for polynomial regression model induction. Math Model Anal 13:17–27CrossRefGoogle Scholar
  32. Kalantary F, Ardalan H, Nariman-Zadeh N (2009) An investigation on the S u–N SPT correlation using GMDH type neural networks and genetic algorithms. Eng Geol 104:144–155CrossRefGoogle Scholar
  33. Khandelwal M, Jahed Armaghani D (2016) Prediction of drillability of rocks with strength properties using a hybrid GA-ANN technique. Geotech Geol Eng 34:605–620.  https://doi.org/10.1007/s10706-015-9970-9
  34. Koopialipoor M, Jahed Armaghani D, Haghighi M, Ghaleini EN (2017) A neuro-genetic predictive model to approximate overbreak induced by drilling and blasting operation in tunnels. Bull Eng Geol Environ 1–10.  https://doi.org/10.1007/s10064-017-1116-2
  35. Koopialipoor M, Fallah A, Jahed Armaghani D, Azizi A, Mohamad ET (2018a) Three hybrid intelligent models in estimating flyrock distance resulting from blasting. Eng Comput 1–14.  https://doi.org/10.1007/s00366-018-0596-4
  36. Koopialipoor M, Jahed Armaghani D, Hedayat A, Marto A, Gordan B (2018b) Applying various hybrid intelligent systems to evaluate and predict slope stability under static and dynamic conditions. Soft Computing, 1–17Google Scholar
  37. Kordnaeij A, Kalantary F, Kordtabar B, Mola-Abasi H (2015) Prediction of recompression index using GMDH-type neural network based on geotechnical soil properties. Soils Found 55:1335–1345CrossRefGoogle Scholar
  38. Madala HR, Ivakhnenko AG (1994) Inductive learning algorithms for complex systems modeling. Crc press, Boca RatonGoogle Scholar
  39. Mahdevari S, Shahriar K, Yagiz S, Shirazi MA (2014) A support vector regression model for predicting tunnel boring machine penetration rates. Int J Rock Mech Min Sci 72:214–229CrossRefGoogle Scholar
  40. Mahdiyar A, Hasanipanah M, Jahed Armaghani D, et al (2017) A Monte Carlo technique in safety assessment of slope under seismic condition. Eng Comput:1–11.  https://doi.org/10.1007/s00366-016-0499-1
  41. Mehrara M, Moeini A, Ahrari M, Erfanifard A (2009) RETRACTED: investigating the efficiency in oil futures market based on GMDH approach. Expert Syst Appl 36:7479–7483CrossRefGoogle Scholar
  42. Minh VT, Katushin D, Antonov M, Veinthal R (2017) Regression models and fuzzy logic prediction of TBM penetration rate. Open Eng 7:60–68CrossRefGoogle Scholar
  43. Mogana SN (2007) The effects of ground conditions on TBM performance in tunnel excavation—a case history. In Proceedings of the 10th Australia New Zealand conference on Geomechanics (pp. 442–447)Google Scholar
  44. Mohamad ET, Hajihassani M, Jahed Armaghani D, Marto A (2012) Simulation of blasting-induced air overpressure by means of artificial neural networks. Int Rev Modell Simulations 5:2501–2506Google Scholar
  45. Mohamad ET, Jahed Armaghani D, Ghoroqi M, et al (2017) Ripping production prediction in different weathering zones according to field data. Geotech Geol Eng 1–19.  https://doi.org/10.1007/s10706-017-0254-4
  46. Najafzadeh M, Barani G-A, Kermani MRH (2013) GMDH based back propagation algorithm to predict abutment scour in cohesive soils. Ocean Eng 59:100–106CrossRefGoogle Scholar
  47. Nariman-Zadeh N, Darvizeh A, Darvizeh M, Gharababaei H (2002) Modelling of explosive cutting process of plates using GMDH-type neural network and singular value decomposition. J Mater Process Technol 128:80–87CrossRefGoogle Scholar
  48. Oraee K, Khorami MT, Hosseini N (2012) Prediction of the penetration rate of TBM using adaptive neuro fuzzy inference system (ANFIS). In: Proceeding of SME Annual Meeting & Exhibit, From the Mine to the Market, Now It’s Global, Seattle, WA, USA. p 297–302Google Scholar
  49. Rostami J, Ozdemir L (1993) A new model for performance prediction of hard rock TBMs. In: Proceedings of the rapid excavation and tunneling conference. Society for Mining, Metallogy & Exploration, Inc, p 793Google Scholar
  50. Roxborough FF, Phillips HR (1975) Rock excavation by disc cutter. In: International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. Elsevier, p 361–366Google Scholar
  51. Salimi A, Esmaeili M (2013) Utilising of linear and non-linear prediction tools for evaluation of penetration rate of tunnel boring machine in hard rock condition. Int J Min Miner Process Eng 4:249–264CrossRefGoogle Scholar
  52. Salimi A, Rostami J, Moormann C, Delisio A (2016) Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs. Tunn Undergr Sp Tech 58:236–246CrossRefGoogle Scholar
  53. Sapigni M, Berti M, Bethaz E et al (2002) TBM performance estimation using rock mass classifications. Int J Rock Mech Min Sci 39:771–788CrossRefGoogle Scholar
  54. Sato K, Gong F, Itakura K (1991) Prediction of disc cutter performance using a circular rock cutting ring. In: Proceedings 1st international mine mechanization and automation symposiumGoogle Scholar
  55. Shams S, Monjezi M, Majd VJ, Jahed Armaghani D (2015) Application of fuzzy inference system for prediction of rock fragmentation induced by blasting. Arab J Geosci 8:10819–10832Google Scholar
  56. Shao C, Li X, Su H (2013) Performance Prediction of Hard Rock TBM Based on Extreme Learning Machine. In: International Conference on Intelligent Robotics and Applications. Springer, p 409–416Google Scholar
  57. Shijing W, Bo Q, Zhibo G (2006) The time and cost prediction of tunnel boring machine in tunnelling. Wuhan Univ J Nat Sci 11:385–388CrossRefGoogle Scholar
  58. Shooshpasha I, MolaAbasi H (2012) Prediction of Liquefaction Induced Lateral Displacements Using Plynomial Neural Networks and Genetic Algorithms. In: 15th World Conference on Earthquake Engineering, Lisbon, PortugalGoogle Scholar
  59. Simoes MG, Kim T (2006) Fuzzy modeling approaches for the prediction of machine utilization in hard rock tunnel boring machines. In: Industry Applications Conference, 2006. 41st IAS Annual Meeting. Conference Record of the 2006 IEEE. IEEE, p 947–954Google Scholar
  60. Singh TN, Verma AK (2012) Comparative analysis of intelligent algorithms to correlate strength and petrographic properties of some schistose rocks. Eng Comput 28:1–12CrossRefGoogle Scholar
  61. Singh VK, Singh D, Singh TN (2001) Prediction of strength properties of some schistose rocks from petrographic properties using artificial neural networks. Int J Rock Mech Min Sci 38(2):269–284Google Scholar
  62. Snowdon RA, Ryley MD, Temporal J (1982) A study of disc cutting in selected British rocks. In: International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. Elsevier, p 107–121Google Scholar
  63. Sohani A, Sayyaadi H, Hoseinpoori S (2016) Modeling and multi-objective optimization of an M-cycle cross-flow indirect evaporative cooler using the GMDH type neural network. Int J Refrig 69:186–204CrossRefGoogle Scholar
  64. Srinivasan D (2008) Energy demand prediction using GMDH networks. Neurocomputing 72:625–629CrossRefGoogle Scholar
  65. Sundaram M (2007) The effects of ground conditions on TBM performance in tunnel excavation–A case historyGoogle Scholar
  66. Sundaram NM, Rafek AG, Komoo I (1998) The influence of rock mass properties in the assessment of TBM performance. In: Proceedings of the 8th IAEG Congress, Vancouver, British Columbia, Canada. p 3553–3559Google Scholar
  67. Swingler K (1996) Applying neural networks: a practical guide. Morgan Kaufmann, New YorkGoogle Scholar
  68. Torabi SR, Shirazi H, Hajali H, Monjezi M (2013) Study of the influence of geotechnical parameters on the TBM performance in Tehran–Shomal highway project using ANN and SPSS. Arab J Geosci 6:1215–1227CrossRefGoogle Scholar
  69. Ulusay R, Hudson JA ISRM (2007) The complete ISRM suggested methods for rock characterization, testing and monitoring: 1974–2006. Comm Test methods Int Soc Rock Mech Compil arranged by ISRM Turkish Natl Group, Ankara, Turkey 628Google Scholar
  70. Verma AK, Singh TN (2013) A neuro-fuzzy approach for prediction of longitudinal wave velocity. Neural Comput Applic 22:1685–1693CrossRefGoogle Scholar
  71. Yagiz S (2002) Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM Model basic penetration for hard rock tunneling machines. Doctoral dissertation, Colorado School of MinesGoogle Scholar
  72. Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Sp Tech 23:326–339CrossRefGoogle Scholar
  73. Yagiz S, Karahan H (2011) Prediction of hard rock TBM penetration rate using particle swarm optimization. Int J Rock Mech Min Sci 48:427–433CrossRefGoogle Scholar
  74. Yagiz S, Karahan H (2015) Application of various optimization techniques and comparison of their performances for predicting TBM penetration rate in rock mass. Int J Rock Mech Min Sci 80:308–315CrossRefGoogle Scholar
  75. Yagiz S, Gokceoglu C, Sezer E, Iplikci S (2009) Application of two non-linear prediction tools to the estimation of tunnel boring machine performance. Eng Appl Artif Intell 22:808–814CrossRefGoogle Scholar
  76. Yagiz S, Sezer E, Gokceoglu C (2012) Artificial neural networks and nonlinear regression techniques to assess the influence of slake durability cycles on the prediction of uniaxial compressive strength and modulus of elasticity for carbonate rocks. Int J Numer Anal Methods Geomech 36(14):1636–1650Google Scholar
  77. Yılmaz I, Yuksek A (2008) An example of artificial neural network (ANN) application for indirect estimation of rock parameters. Rock Mech Rock EngGoogle Scholar
  78. Zorlu K, Gokceoglu C, Ocakoglu F, Nefeslioglu HA, Acikalin S(2008) Prediction of uniaxial compressive strength of sandstones using petrography-based models. Eng Geol 96(3–4):141–158Google Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2018

Authors and Affiliations

  • Mohammadreza Koopialipoor
    • 1
    Email author
  • Sayed Sepehr Nikouei
    • 2
  • Aminaton Marto
    • 3
  • Ahmad Fahimifar
    • 4
  • Danial Jahed Armaghani
    • 4
  • Edy Tonnizam Mohamad
    • 5
  1. 1.Faculty of Civil and Environmental EngineeringAmirkabir University of TechnologyTehranIran
  2. 2.Faculty of Civil and Environmental EngineeringAmirkabir University of TechnologyTehranIran
  3. 3.Environmental Engineering & Green Technology Department, Malaysia-Japan International Institute of TechnologyUniversiti Teknologi MalaysiaKuala LumpurMalaysia
  4. 4.Department of Civil and Environmental EngineeringAmirkabir University of TechnologyTehranIran
  5. 5.Centre of Tropical Geoengineering (GEOTROPIK), Faculty of Civil EngineeringUniversiti Teknologi Malaysia (UTM)SkudaiMalaysia

Personalised recommendations