Abstract

Water inrush in karst tunnels is a dynamic process in which internal and external factors are involved. The evaluation of this process is fuzzy, complex, and uncertain. In the current research, few articles give full consideration to the fuzziness and randomness of the water inrush evaluation with useful dynamic feedback. A new assessment method has been proposed for the water inrush evaluation based on a combination of the weighting method and normal cloud model. Specifically, an evaluation index system is forged and each index is quantitatively classified into four grades. A synthetic weighted algorithm combining the analytic hierarchy process, entropy method, and statistical methods is proposed to assign the index weight rationally. Based on the cloud generator algorithm, three numerical characteristics are calculated and a sufficient number of cloud droplets are generated. The membership degree of each index belonging to each grade is constructed and the integrated certain grades are determined. In this paper, the multi-factor normal cloud assessment method is applied to the risk assessment of the Qiyueshan tunnel. The assessment result of the risk grade is accurate, that is, the water inrush risk of different samples at the same risk grade can be reflected in figures. The results not only show high consistency with other assessment methods but are also in good agreement with the excavation results. The proposed cloud model method demonstrates good practical reference for risk assessment of tunnel construction in karst areas and can be applied to tunneling, mining, and other engineering practices in the future.

Keywords

Water inrush Karst tunnel Risk assessment Normal cloud model Combination weighting 

Notes

Acknowledgements

We would like to acknowledge the financial support from the National Natural Science Foundation of China (Grant No.s: 51509147, 51379112), the promotive research fund for excellent young and middle-aged scientists of Shandong Province (Grant No.: BS2014NJ004) and The Fundamental Research Funds of Shandong University (Grant No.s: 2017JC002, 2017JC001).

References

  1. Bu L, Li S, Shi S, Li L, Zhao Y, Zhou Z et al (2017). Application of the comprehensive forecast system for water-bearing structures in a karst tunnel: a case study. Bull Eng Geol Environ (4):1–17Google Scholar
  2. Cui QL, Wu HN, Shen SL, Xu YS, Ye GL (2015) Chinese karst geology and measures to prevent geo-hazards during shield tunneling in karst region with caves. Nat Hazards 77(1):129–152Google Scholar
  3. Hao Y, Rong X, Ma L, Fan P, Lu H (2016) Uncertainty analysis on risk assessment of water inrush in karst tunnels. Math Probl Eng 2016(2):1–11Google Scholar
  4. Jakiel P, Fabianowski D (2015) FAHP model used for assessment of highway RC bridge structural and technological arrangements. Expert Syst Appl 42(8):4054–4061Google Scholar
  5. Li X, Li Y (2014) Research on risk assessment system for water inrush in the karst tunnel construction based on Gis: case study on the diversion tunnel groups of the Jinping II hydropower station. Tunnel Undergr Space Technol 40(2):182–191Google Scholar
  6. Li D, Liu C, Gan W (2010) A new cognitive model: cloud model. Int J Intell Syst 24(3):357–375Google Scholar
  7. Li L, Li SC, Chen J, Li JL, Xu ZH, Shi SS (2011) Construction license mechanism and its application based on karst water inrush risk evaluation. Chin J Rock Mech Eng 30(7):1345–1354Google Scholar
  8. Li ZL, Wang XH, Xie LZ (2012) Risk evaluation and comprehensive geological prediction based on fuzzy wavelet neural network during tunneling in karst area. Geoscience 27(3):719–726Google Scholar
  9. Li SC, Zhou ZQ, Li LP, Xu ZH, Zhang QQ, Shi SS (2013) Risk assessment of water inrush in karst tunnels based on attribute synthetic evaluation system. Tunnel Undergr Space Technol 38:50–58Google Scholar
  10. Li L, Lei T, Li S, Zhang Q, Xu Z, Shi S, Zhou Z (2015) Risk assessment of water inrush in karst tunnels and software development. Arab J Geosci 8(4):1843–1854Google Scholar
  11. Li SC, Wu J, Xu ZH, Li LP (2017a) Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application. KSCE J Civ Eng 21:1–13Google Scholar
  12. Li X, Zhang P, He Z, Huang Z, Cheng M, Guo L (2017b) Identification of geological structure which induced heavy water and mud inrush in tunnel excavation: a case study on lingjiao tunnel. Tunnel Undergr Space Technol 69:203–208Google Scholar
  13. Liang DX, Jiang ZQ, Zhu SY, Sun Q, Qian ZW (2016) Experimental research on water inrush in tunnel construction. Nat Hazards 81(1):467–480Google Scholar
  14. Liu HC, You JX, You XY, Shan MM (2015) A novel approach for failure mode and effects analysis using combination weighting and fuzzy vikor method. Appl Soft Comput 28(C):579–588Google Scholar
  15. Lyu HM et al (2018a) Flood risk assessment in metro systems of mega-cities using a GIS-based modeling approach. Sci Total Environ.  https://doi.org/10.1016/j.scitotenv.2018.01.138
  16. Lyu HM et al (2018b) Assessment of geohazards and preventative countermeasures using AHP incorporated with GIS in Lanzhou. Chin Sustainabil 10(2):304.  https://doi.org/10.3390/su10020304 Google Scholar
  17. Moon J, Fernandez G (2010) Effect of excavation-induced groundwater level drawdown on tunnel inflow in a jointed rock mass. Eng Geol 110(3–4):33–42Google Scholar
  18. Saaty TL (2003) Decision-making with the ahp: why is the principal eigenvector necessary. Eur J Oper Res 145(1):85–91Google Scholar
  19. Shen SL, Wu HN, Cui YJ, Yin ZY (2014) Long-term settlement behaviour of metro tunnels in the soft deposits of shanghai. Tunn Undergr Space Technol 40:309–323Google Scholar
  20. Shen SL, Cui QL, Ho CE, Xu YS (2016) Ground response to multiple parallel microtunneling operations in cemented silty clay and sand. J Geotech Geoenviron Eng 142(5):04016001Google Scholar
  21. Shin JH (2010) Analytical and combined numerical methods evaluating pore water pressure on tunnels. Géotechnique 60(2):141–145Google Scholar
  22. Tudes S, Yigiter ND (2010) Preparation of land use planning model using gis based on ahp: case study Adana-Turkey. Bull Eng Geol Environ 69(2):235–245Google Scholar
  23. Wang Y, Yang W, Li M, Liu X (2012) Risk assessment of floor water inrush in coal mines based on secondary fuzzy comprehensive evaluation. Int J Rock Mech Min Sci 52(6):50–55Google Scholar
  24. Wang G, Xu C, Li D (2014) Generic normal cloud model. Inf Sci 280:1–15Google Scholar
  25. Wang Y, Jing H, Yu L, Su H, Luo N (2017a) Set pair analysis for risk assessment of water inrush in karst tunnels. Bull Eng Geol Environ 76(3):1199–1207Google Scholar
  26. Wang XT, Li SC, Ma XY, Xue YG, Hu J, Li ZQ (2017b) Risk assessment of rockfall hazards in a tunnel portal section based on normal cloud model. Pol J Environ Stud 26(5):2295–2306Google Scholar
  27. Wu Q, Fan S, Zhou W, Liu S (2013) Application of the analytic hierarchy process to assessment of water inrush: a case study for the no. 17 coal seam in the Sanhejian coal mine, China. Mine Water Environ 32(3):229–238Google Scholar
  28. Wu HN, Shen SL, Liao SM, Yin ZY (2015) Longitudinal structural modelling of shield tunnels considering shearing dislocation between segmental rings. Tunnel Undergr Space Technol Incorp Trench Technol Res 50:317–323Google Scholar
  29. Xu ZH, Li SC, Li LP et al (2011a) Risk assessment of water or mud inrush of karst tunnels based on analytic hierarchy process. Rock Soil Mech 32(6):1757–1766Google Scholar
  30. Xu ZH, Li SC, Li LP et al (2011b) Construction permit mechanism of karst tunnels based on dynamic assessment and management of risk. Chin J Geotech Eng 33(11):1714–1725Google Scholar
  31. Yazdani CA (2014) Proposing a new methodology based on fuzzy logic for tunnelling risk assessment. J Civ Eng Manag 20(1):82–94Google Scholar
  32. Yin S, Zhang J, Liu D (2015) A study of mine water inrushes by measurements of in situ stress and rock failures. Nat Hazards 79(3):1961–1979Google Scholar
  33. Zainal SFFS, Ismail MAM, Mostafa R et al (2016) Hydrogeochemistry of tunnel seepage water along the contact of zone of metasedimentary and granitic rock within the Pahang–Selangor raw water transfer tunnel project, Malaysia. Arab J Geosci 9(4):1–11Google Scholar
  34. Zhang W, Chen JP, Wang Q, An Y, Qian X, Xiang L et al (2013) Susceptibility analysis of large-scale debris flows based on combination weighting and extension methods. Nat Hazards 66(2):1073–1100Google Scholar
  35. Zhang G, Zhang K, Wang L, Wu Y (2015) Mechanism of water inrush and quicksand movement induced by a borehole and measures for prevention and remediation. Bull Eng Geol Environ 74(4):1–11Google Scholar
  36. Zhong FP, Li DY, Zhang W, Huang BR (2008) Analysis of water leakage during construction of Qingshangang tunnel and study of leakage treatment measures. Chinese Journal of Underground Space and Engineering 4(1):190–194Google Scholar
  37. Zhu B, Wu L, Peng Y, Zhou W, Chen C (2018) Risk assessment of water inrush in tunnel through water-rich fault. Geotech Geol Eng 36(1):317–326Google Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2018

Authors and Affiliations

  1. 1.Geotechnical & Structural Engineering Research CenterShandong UniversityJinanChina

Personalised recommendations