Abstract

The role of the microgrid to meet up the localized power demand is of immense importance considering the growing power demand as well as grid inadequacy in Indian power scenario. Apart from meeting localized power demand with various distributed generating sources microgrid can render support to the adjacent main grid or similar localized grid as when needed. This paper presents the techniques for identifying placement sites for Phasor Measurement Units (PMUs) in a microgrid system based on complete observability of the system. The main objective of optimal placement of PMU problem is to determine a minimal set of PMUs such that the whole system is observable. This study has been done on a 14 bus test model with the help of PSAT.

Notes

References

  1. Ashton PM, Taylor GA, Irvin MR, Pisica I, Carter AM, Bradley ME (2013) Novel application of detrended fluctuation analysis for state estimation using synchrophasor measurements. IEEE Trans Power Syst 28(2):1930–1938CrossRefGoogle Scholar
  2. Kaur S, Singh B, Sra JS (2016) Optimal Placement of phasor measurement units on IEEE-24 bus system using PSAT. Int J Eng Sci Res TechnolGoogle Scholar
  3. La Ree J, De Centeno V, Thorp JS, Phadke AG (2010) Synchronized phasor measurement applications in power systems. IEEE Trans Smart Grid 1(1):20–27CrossRefGoogle Scholar
  4. Manousakis NM, Korres GN, Georgilakis PS (2011) Optimal placement of phasor measurement units: a literature review. IEEE.  https://doi.org/10.1109/ISAP.2011.6082183
  5. Mohsenian-Rad H, Stewart E, Cortez E (2018) Distribution synchrophasors: pairing big data with analytics to create actionable information. IEEE Power Energy Mag 16(3):26–34CrossRefGoogle Scholar
  6. Phadke AG, Thorp JS (2006) History and applications of phasor measurements. Power systems conference and exposition, 2006, PSCE’06. 2006 IEEE PES, Oct 29, 2006–Nov 1, 2006Google Scholar
  7. Pignati M, Zanni L, Romano P, Cherkaoui R, Paolone M (2017) Fault detection and faulted line identification in active distribution networks using synchrophasors-based real-time state estimation. IEEE Trans Power Delivery 32(1):381–392CrossRefGoogle Scholar
  8. Sadeghi-Mobarakeh A, Shahsavari A, Haghighat H, Mohsenian-Rad H (2018) Optimal market participation of distributed load resources under distribution network operational limits and renewable generation. IEEE Trans Smart Grid (Accept)Google Scholar
  9. Sandhya Rani G (2015) Optimal PMU placement using linear integer programming technique. IJISET 2(4)Google Scholar
  10. Singh P (2014) Optimal PMU placement in power system networks using integer linear programming. Int J Innovative Res Sci Eng Technol 3(3)Google Scholar
  11. Sutar C, Verma KS (2013) Application of phasor measurement unit in smart grid. Int J Sci Spiritual Bus Technol (IJSSBT) 1(2) [Issn (Print) 2277–7261] Google Scholar
  12. Venugopal G, Veilumuthu R, Avila Theresa P (2010) Optimal PMU placement and observability of power system using PSAT. In 2010 Int. Joint Journal Conf. on Engineering and Technology, pp 67–71Google Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Department of Electrical EngineeringGNITSodepur, PanihatiIndia
  2. 2.Department of Electrical EngineeringIIESTShibpurIndia

Personalised recommendations