Abstract
The Marmaray Project (Lykke and Belkaya 2005) in Istanbul, which provides an upgraded urban railway system approximately 76 km long with a 13.4 km underground section (see Fig. 1), is under construction to overcome Istanbul’s chronic traffic congestion. Istanbul is divided into a European side and an Asian side by the Bosphorus Strait, thus the new railway system needs to cross the strait. An immersed tunnel method was applied for the construction of the tunnel, called Bosphorus Crossing Immersed Tunnel, and it is at the present time the world’s deepest immersed tube tunnel. The tunnel elements were prefabricated off-site and towed by ship to the work-site for installation and connection to the previously installed underwater elements. The remaining parts on the Asian side and the European side are being constructed using TBMs (tunnel boring machines) and are to be connected to both ends of the immersed tunnel, which consists of 11 individual submarine elements each approximately 135 m long, 15.3 m wide and 8.6 m tall. The total length of the immersed tunnel is 1,387 m and the maximum depth of the bottom of the tunnel is 60 m under the water of the Bosphorus Strait.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Arisoy Y, Akyarli A (1989) Long term current and sea level measurements conducted at Bosphorus. In: Pratt LD (ed) The physical oceanography of sea straits, NATO/ASI series. Kluwer, Dordrecht, pp 225–236
Ducet N, Le Traon PY, Gauzelin P (1999) Response of the Black Sea mean level to atmospheric pressure and wind forcing. J Marine Syst 22:311–327
Gil E, de Toro C (2005) Improving tide-gauge data processing: a method involving tidal frequencies and inverted barometer effect. Comput Geosci 31:1048–1058
Grantz WC (1993) Catalog of immersed tunnels. Tunn Undergr Space Technol 8:175–263
Gregg MC, Özsoy E (2002) Flow, water mass changes, and hydraulics in the Bosphorus. J Geophys Res 107(C3):2.1–2.23
Gregg MC, Özsoy E, Latif MA (1999) Quasi-steady exchange flow in the Bosphorus. Geophys Res Lett 26:83–86
Ito K, Oda Y, Honda T, Koyama F (2009) Construction techniques for deep water immersed tunnel in the Bosphorus Strait. In: Chung JS, Prinsenberg S, Hong SW, Nagata S (eds) The nineteenth international offshore and polar engineering conference. International society of offshore and polar engineers, California, pp 217–224
Jensen HR, Babovic V, Rasmussen EB (2000) Real-time current forecasts for tunnel element towing in Øresund. In: Øresundsbro konsortiet (ed) Øresund link immersed tunnel conference. Øresund tunnel contractors and international tunnelling association, Copenhagen, p D8
Komatsu T, Ohgushi K, Asai K (1997) Refined numerical scheme for advective transport in diffusion simulation. J Hydraul Eng (ASCE) 123:41–50
Lesser GR, Roelvink JA, van Kester JATM, Stelling GS (2004) Development and validation of a three-dimensional morphological model. Coast Eng 51:883–915
Lykke S, Belkaya H (2005) Marmaray project: the project and its management. Tunn Undergr Space Technol 20:600–603
Lykke S, Kerk F (2005) Marmaray project: marine operations, the Bosphorus crossing. Tunn Undergr Space Technol 20:609–611
Oda Y, Ito K, Ueno S, Sakaeda H (2005) Hydraulic physical model test of mooring for the immersed tunnel construction under the Bosphorus Strait. In: Choi BH, Suh KD, Yoon SB (eds) Third international conference on Asian and Pacific coasts. Hanrimwon, Korea, pp 260–274
Spellman FR (2009) The science of air: concepts and applications. CRC Press, Boca Raton, FL, p 291
Tanaka M, Serafy GE, Gerritsen H, Adachi T (2005) Development of a new real time flow forecast model in estuary based on ensemble kalman filter (in Japanese). J Coast Eng (JSCE) 52:321–325
Yüce H (1993) Water level variations in the sea of Marmara. Oceanol Acta 16:335–340
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Oda, Y., Ito, K., Honda, T., Yim, S. (2010). Construction Techniques for Deep-water Immersed Tunnel Using Real-time Sea Strait Current Forecast. In: Badescu, V., Cathcart, R. (eds) Macro-engineering Seawater in Unique Environments. Environmental Science and Engineering(). Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-14779-1_8
Download citation
DOI: https://doi.org/10.1007/978-3-642-14779-1_8
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-14778-4
Online ISBN: 978-3-642-14779-1
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)