Mechanisms of suspended sediment restoration and bed level compensation in downstream reaches of the Three Gorges Projects (TGP)

  • Published:
Journal of Geographical Sciences Aims and scope Submit manuscript

Abstract

River basin reservoir construction affects water and sediment transport processes in downstream reaches. The downstream impact of the Three Gorges Projects (TGP) has started to become apparent: (1) reduction in flood duration and discharge, and significant reduction in sediment load. Although there was some restoration in downstream sediment load, the total amount did not exceed the pre-impoundment annual average; (2) in 2003–2014, the d > 0.125 mm (coarse sand) load was restored to some degree, and to a maximum at Jianli Station, which was mainly at the pre-impoundment average. After restoration, erosion and deposition characteristics of the sediment was identical to that before impoundment. The degree of restoration during 2008–2014 was less than during 2003–2007; (3) after TGP impoundment, there was some restoration in d < 0.125 mm (fine sand) sediment load, however, it was lower than the pre-impoundment average; (4) due to riverbed compensation, the d > 0.125 mm sediment load recovered to a certain degree after impoundment, however, the total did not exceed 4400×104 t/y. This was mainly limited by flood duration and the average flow rate, and was less affected by upstream main stream, tributaries, or lakes. Restoration of d < 0.125 mm suspended sediment was largely controlled by upstream main stream, tributaries, and lakes, as well as by riverbed compensation. Due to bed armoring, riverbed fine suspended sediment compensation capability was weakened; (5) during 2003–2007 and 2008–2014, Yichang to Zhicheng and upper Jingjiang experienced coarse and fine erosion, lower Jingjiang experienced coarse deposition and fine erosion, Hankou to Datong had coarse deposition and fine erosion, and Chenglingji and Hankou was characterized by coarse deposition and fine sand erosion in 2003–2007, and coarse and fine erosion in 2008–2014. This difference was controlled by flood duration and number at Luoshan Station.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ban Xuan, Jiang Liuzhi, Zeng Xiaohui et al., 2014. Quantifying the spatio-temporal variation of flow and sediment in the middle Yangtze River after the impoundment of the Three Gorges. Advances in Water Science, 25(5): 650–657. (in Chinese)

    Google Scholar 

  • Benn Patrick C, Erskine Wayne D, 1994. Complex channel response to flow regulation: Cudgegong River below Windermere Dam, Australia. Applied Geography, 14(2): 153–168. doi: 10.1016/0143-6228(94)90058-2.

    Article  Google Scholar 

  • Chen Fei, Li Yitian, Tang Jinwu et al., 2010. Analysis of group-sized sediment transports downstream a reservoir. Journal of Hydroelectric Engineering, 9(1): 164–170. (in Chinese)

    Google Scholar 

  • Chen Jianguo, Zhou Wenhao, Yuan Yuping, 2002. Transportation and adjustment of different grain sized sediment along the Lower Yellow River under typical operation modes of Sanmenxia Reservoir. Journal of Sediment Research, (2): 15–22. (in Chinese)

    Google Scholar 

  • Dai S B, Lu X X, Yang S L et al., 2008. A preliminary estimate of human and natural contributions to the decline in sediment flux from the Yangtze River to the East China Sea. Quaternary International, 186(1): 43–54. doi: 10.1016/j.quaint.2007.11.018.

    Article  Google Scholar 

  • Dai S B, Yang S L, Li M, 2009. The sharp decrease in suspended sediment supply from China’s rivers to the sea: Anthropogenic and natural causes. Hydrological Sciences Journal, 54(1): 134–146. doi: 10.1623/hysj.54.1.135.

    Article  Google Scholar 

  • Dai Zhijun, Chu Ao, Stive Marcel et al., 2011. Is the Three Gorges Dam the cause behind the extremely low suspended sediment discharge into the Yangtze (Changjiang) Estuary of 2006? Hydrological Sciences Journal, 56(7): 1280–1288. doi: 10.1080/02626667.2011.585136.

    Article  Google Scholar 

  • Guo Xiaohu, Li Yitian, Qu Geng et al., 2014. Analysis of sediment transport in Middle Yangtze River after filling of the Three Gorges Reservoir. Journal of Sediment Research, (5): 11–17. (in Chinese)

    Google Scholar 

  • Han Qiwei, 2003. Reservoir Siltation. Beijing: Science Press, 582–607. (in Chinese)

    Google Scholar 

  • Hu Chaoyang, Wang Erpeng, Wang Xinqiang, 2015. Analysis of channel evolution under combined action of reservoir and channel sand excavation. Journal of Water Resources & Water Engineering, 26(3): 178–183. (in Chinese) DOI:1011705/j.issn.1672-643X.2015.03.37.

    Google Scholar 

  • Huang Zhaobiao, Li Ming, 2016. The prototype observation report of Yichang to Anqing reaches of the Yangtze River. Wuhan: Changjiang Waterway Planning Design and Research Institute, 15–16. (in Chinese)

    Google Scholar 

  • Hydrology Bureau, Changjiang Water Resource Commission (HB, CWRC), 2002. Analysis of river bed erosion downstream from Danjiangkou reservoir in period of retardation and period of water impoundment. In: Sediment Research of Three Gorge Project (Vol. 7). Beijing: Beijing Intellectual Property Press, 75–82. (in Chinese)

    Google Scholar 

  • Li Qiongfang, Yu Meixiu, Lu Guobin et al., 2011. Impacts of the Gezhouba and Three Gorges reservoirs on the sediment regime in the Yangtze River, China. Journal of Hydrology, 403(3/4): 224–233. doi: 10.1016/j.jhydrol. 2011.03.043.

    Article  Google Scholar 

  • Li Yitian, Sun Zhaohua, Deng Jinyun, 2003. A study on riverbed erosion downstream from the Three Gorges Reservoir. Journal of Basic Science and Engineering, 11(3): 283–295. (in Chinese)

    Article  Google Scholar 

  • Luo X X, Yang S L, Zhang J, 2012. The impact of the Three Gorges Dam on the downstream distribution and texture of sediments along the middle and lower Yangtze River (Changjiang) and its estuary and subsequent sediment dispersal in the East China Sea. Geomorphology, 179(1): 126–140. doi: 10.1016/j.geomorph.2012.05. 034.

    Article  Google Scholar 

  • Sun Zhaohua, Li Yitian, Ge Hua et al., 2011. Channel erosion processes of transitional reach from gravel river bed to sand bed in middle Yangtze River. Journal of Hydraulic Engineering, 42(7): 789–797. (in Chinese)

    Google Scholar 

  • Wang Yangui, Liu Xi, Shi Hongling, 2014. Variations and influence factors of runoff and sediment in the Lower and Middle Yangtze River. Journal of Sediment Research, (5): 38–47. (in Chinese)

    Google Scholar 

  • Williams G P and Wolman M G, 1984. Downstream effects of dams on alluvial rivers. In: Geological Survey Professional Paper 1286 U. S. Government Printing Office, Washington, DC, v q83pp.

    Google Scholar 

  • Xia Junqiang, Zong Quanli, Deng Shanshan et al., 2014. Seasonal variations in composite riverbank stability in the Lower Jingjiang Reach, China. Journal of Hydrology, 9(Part D): 3664–3673. doi: 10.1016/j.jhydrol.2014.10.061.

    Article  Google Scholar 

  • Yang S L, Milliman J D, Xu K H et al., 2014b. Downstream sedimentary and geomorphic impacts of the Three Gorges Dam on the Yangtze River. Earth-Science Reviews, 138: 469–486. doi: 10.1016/j.earscirev.2014.07.006.

    Article  Google Scholar 

  • Yang S L, Xu K H, Milliman J D et al., 2015b. Decline of Yangtze River water and sediment discharge: Impact from natural and anthropogenic changes. Scientific Reports, 5: 12581. doi: 10.1038/srep12581.

    Article  Google Scholar 

  • Yang Yunping, Deng Jinyun, Zhang Mingjin et al., 2015a. The synchronicity and difference in the change of suspended sediment concentration in the Yangtze River Estuary. Journal of Geographical Sciences, 25(4): 399–416. doi: 10.1007/s11442-015-1176-9.

    Article  Google Scholar 

  • Yang Yunping, Li Yitian, Sun Zhaohua et al., 2014a. Suspended sediment load in the turbidity maximum zone at the Yangtze River Estuary: The trends and causes. Journal of Geographical Sciences, 24(1): 129–142. doi: 10.1007/s11442-014-1077-3.

    Article  Google Scholar 

  • Zheng Shouren, 2015. Risk analysis of implementing middle-small flood dispatch by Three Gorges Project and countermeasures. Yangtze River, 46(5): 7–12. (in Chinese)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yunping Yang.

Additional information

Foundation: National Natural Science Foundation of China, No.51479146, No.51579123, No.51509012; Fundamental Research Funds for Central Welfare Research Institutes, No.TKS160103; No.TKS150102; The National Key Research & Development Programs, No.2013BAB12B01; National Key Research Program of China, No.2016YFC0402106

Author: Zhang Wei, specialized in river and coastal dynamics, sediment transport, mathematical modelling of fluvial processes.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhang, W., Yang, Y., Zhang, M. et al. Mechanisms of suspended sediment restoration and bed level compensation in downstream reaches of the Three Gorges Projects (TGP). J. Geogr. Sci. 27, 463–480 (2017). https://doi.org/10.1007/s11442-017-1387-3

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11442-017-1387-3

Keywords

Navigation